Find or Sell Used Cars, Trucks, and SUVs in USA

White, 4-door, Cloth, V6 on 2040-cars

Year:2006 Mileage:135231
Location:

Nacogdoches, Texas, United States

Nacogdoches, Texas, United States
Advertising:

Auto Services in Texas

Xtreme Customs Body and Paint ★★★★★

Automobile Body Repairing & Painting
Address: 4524 Dyer St, Tornillo
Phone: (915) 584-1560

Woodard Paint & Body ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 3515 Ross Ave, Dfw
Phone: (214) 821-3310

Whitlock Auto Kare & Sale ★★★★★

Auto Repair & Service, New Car Dealers
Address: 1325 Whitlock Ln 205, Shady-Shores
Phone: (972) 242-5454

Wesley Chitty Garage-Body Shop ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 805 W Frank St, Van
Phone: (903) 962-3819

Weathersbee Electric Co ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Electric Service
Address: 7 E Highland Blvd, San-Angelo
Phone: (325) 655-7555

Wayside Radiator Inc ★★★★★

Auto Repair & Service, Radiators Automotive Sales & Service
Address: 1815 Wayside Dr, Pasadena
Phone: (713) 923-4122

Auto blog

GM's Oshawa plant may close after Camaro production moves

Sat, Feb 7 2015

Most of the time, when vehicle production is moved from one assembly plant to another, it spells bad news for the former. While General Motors won't go so far as to say its Oshawa, Ontario factory, which is losing the Chevrolet Camaro to the Lansing Grand River plant, is in trouble, analysts seem to think the factory's days are numbered. Forecasts for the facility are far from positive. The loss of the Camaro this year, combined with GM's targeted shutdown of a single-shift assembly line responsible for the fleet-only Chevy Impala Limited and the Equinox crossover is a bad enough omen. But with AutoForecast Solutions CEO Joe McCabe telling The Detroit News that the plant's other two products, the Cadillac XTS and Buick Regal, aren't likely to stick around beyond 2017, things look decidedly grim at Oshawa. "There is a fairly strong chance that the plant could close," Jeff Schuster, senior VP of forecasting for LMC Automotive, told The Detroit News. That doesn't mean that Unifor, Canada's auto union, and the Canadian government are going to let the factory die without a fight. And with the latter chipping in $10 billion as part of GM's 2009 bailout, you might think it has a degree of leverage in the situation. A meeting between the government and the Detroit Three at the 2015 North American International Auto Show revealed that Oshawa is already a topic of conversation. "We made it very clear that we would like to see an indication on the future of Oshawa sooner, in particular because the timing is very challenging for our supply chain to be able to adjust to potentially future orders or changes, but also to know that there are going to be future opportunities at Oshawa," Ontario's Minister of Economic, Development, Employment and Infrastructure Brad Duguid told The Detroit News. "Bottom line: It's time they made a longer-term commitment here," Unifor President Jerry Dias said, echoing Duguid's statements. It's unclear if this sort of strong talk will be enough to save 3,300-plus employees, although based on the analysts' forecasts, we doubt it.

Chevy to resume engine-building program for 2015 Corvette Z06

Thu, Jan 8 2015

One of Chevrolet's most popular and unique customer features is set to return for 2015, as the company has announced that the Engine Build Experience is back. Interested owners will be able to screw together their engines beginning in March. The $5,000 option (which does not include the cost of travel) will give future owners of the 2015 Corvette Z06 the chance to screw together their car's actual 6.2-liter, supercharged V8. Available on each of the Z06's three trims, the Engine Build Experience includes a day at the Performance Build Center, instruction from an engine assembly tech, photographs of the experience and a personalized engine plaque. Once the build process is completed, the engine will (eventually) be fitted under the hood of the customer's personal Z06. "Chevrolet recognizes the passion customers have for Corvette and the Engine Build Experience offers them a truly unique opportunity for hands-on involvement in the creation of the heart of their new car," Corvette product manager Harlan Charles. "It's important for customers to understand their engine won't be installed the day after they built it. It will flow into the scheduling process for vehicle assembly, which depends on a number of logistical variables." Scroll down for the official announcement of the Z06's Engine Build Experience, available below. Exclusive Corvette Engine Build Experience Returns Program renewed for supercharged LT4 engine at new Bowling Green build center 2015-01-07 BOWLING GREEN, Ky. – Chevrolet announced today it is resuming the exclusive Engine Build Experience for Corvette Z06 customers – the only program of its kind for supercar customers. Starting in March 2015, Corvette Z06 customers will be able to assemble the 650-hp supercharged LT4 engine for their cars at the new Performance Build Center inside the Bowling Green Assembly Plant. "Chevrolet recognizes the passion customers have for Corvette and the Engine Build Experience offers them a truly unique opportunity for hands-on involvement in the creation of the heart of their new car," said Harlan Charles, Corvette product manager. "It's a chance to bond with their new car." The Engine Build Experience is selected with order code PBC and is offered on all Z06 trim levels.

Next-gen Chevy Volt will get 1.5-liter, four-cylinder engine

Tue, Oct 28 2014

As General Motors gets ready to unveil the new Chevy Volt at the Detroit Auto Show in January, it's starting to reveal a few more details about the updated plug-in hybrid. Today should be fruitful on that front, thanks to an event GM is hosting today that focuses on the new Volt, and we've just had the first bit of new: a bigger engine is coming. Since the beginning, the Volt has used a 1.4-liter, four-cylinder engine as a range extender when the battery runs dry. The second-generation model will instead get a slightly larger 1.5-liter, four-cylinder engine that will be built in Flint, MI. That's a step up from the various engines that have been a part of the 2016 Volt's rumored mills, everything from a 1.0-liter or 1.2-liter three-cylinder to a 2.0-liter turbo. The confirmation about the new 1.5-liter powerplant was found in Automotive News, where we also heard again that GM is going to start building the new Volt's electric drive unit in Detroit, moving production up from Mexico. We will have more information on the 2016 Chevy Volt later today.