2011 Chevrolet Tahoe on 2040-cars
Newport Center, Vermont, United States
If you have any questions or would like to view the car in person please email me at: soniasmmcauley@ukschool.com .
We have very much enjoyed this Tahoe for five years and now it is time to down size.
This has all the options including heated leather seats, third row seats, rear TV, rear radio and HVAC controls,
Z71 Off Road Package, XM Radio, Power Moon Roof, New winter snow tires last fall (about 5,000 miles on them) and
new brake pads "all wheels" this summer.
Chevrolet Tahoe for Sale
- 2007 chevrolet tahoe z71 ltz(US $10,000.00)
- 2011 chevrolet tahoe(US $17,400.00)
- 2010 chevrolet tahoe ltz(US $14,190.00)
- Chevrolet tahoe lt sport utility 4-door(US $22,000.00)
- Chevrolet tahoe lt 4wd 4dr 1500 4x4(US $13,000.00)
- Chevrolet tahoe lt 4wd 4dr 1500 4x4(US $13,000.00)
Auto Services in Vermont
Handy Toyota ★★★★★
Goss Tire Company ★★★★★
Freedom Nissan ★★★★★
Bond Auto Parts ★★★★★
AAMCO Transmissions & Total Car Care ★★★★★
Valvoline Instant Oil Change ★★★★
Auto blog
GM Recalling 370,000 Trucks For Fire Risk
Mon, Jan 13 2014DETROIT (AP) - General Motors is recalling 370,000 Chevrolet Silverado and GMC Sierra pickups from the 2014 model year to fix software that could cause the exhaust components to overheat and start a fire. The recall includes 303,000 trucks in the U.S. and 67,000 in Canada and Mexico. All of the trucks involved have 4.3-liter or 5.3-liter engines. GM said eight fires have been reported, but no injuries. One garage was damaged, the company said. All of the incidents occurred in cold weather. The company is asking customers not to leave their trucks idling unattended. GM dealers will reprogram the software for free. The company will inform owners starting Jan. 16. The major recall announcement, which came on Saturday, marred the Silverado's winning of the 2014 North American Truck of the Year Award at the Detroit Auto Show on Monday. Related Gallery Our Favorite Cars For Winter View 11 Photos Recalls Chevrolet sierra
Detroit 3 to implement delayed unified towing standards for 2015
Tue, Feb 11 2014Car buyers have a responsibility to be well-informed consumers. That's not always a very simple task, but some guidelines are self-evident. If you live in a very snowy climate, you generally know a Ford Mustang or Chevrolet Camaro might not be as viable a vehicle choice as an all-wheel drive Explorer or Traverse, for example. If you want a fuel-efficient car, it's generally a good idea to know the difference between a diesel and a hybrid. But what if it's kind of tough to be an informed consumer? What if the information you need is more difficult to come by, or worse, based on different standards for each vehicle? Well, in that case, you might be a truck shopper. For years, customers of light-duty pickups have had to suffer through different ratings of towing capacities for each brand. For 2015 model year trucks, though, that will no longer be a problem. According to Automotive News, General Motors, Ford and Chrysler Group have announced that starting with next year's models, a common standard will be used to measure towing capacity. The Detroit Three will join Toyota, which adopted the Society of Automotive Engineers' so-called SAE J2807 standards way back in 2011. The standard was originally supposed to be in place for MY2013, but concerns that it would lower the overall stated capacity for trucks led Detroit automakers to pass. Ford originally passed, claiming it'd wait until its new F-150 was launched to adopt the new standards, leading GM and Ram to follow suit. Nissan, meanwhile, has said it will adopt the new standards as its vehicles are updated, meaning the company's next-generation Titan should adhere to the same tow ratings as its competitors. While the adoption of SAE J2807 will be helpful for light-duty customers, those interested in bigger trucks will still be left with differing standards. There is no sign of the new tow standards being adopted for the heavy-duty market.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.