Find or Sell Used Cars, Trucks, and SUVs in USA

Chevrolet Silverado Duramax Crew Cab 2500hd 4wd Diesel on 2040-cars

US $16,200.00
Year:2005 Mileage:197400
Location:

Erie, Pennsylvania, United States

Erie, Pennsylvania, United States
Advertising:

 For sale 05' LLY Chevy Duramax Crew Cab 6'4"bed. I am the second owner but I have owned her since 06'.
LineX bed liner
Truxedo bed cover
4" turbo back exhaust but I did run a through pipe muffler
265 tires on hummer 17" hummer wheels ( I have the stock wheels with studded winters but they only have one season left in them)
Electric brake control
Gooseneck trailer ball ( I'm not sure what they are called but it is the type that sits flush with the bed and you pull a pin and flip the ball over)
EGR is unplugged and it does not throw a code
I bought it with 50,000 miles and changed all the fluids (both differentials, transfer case, transmission) I just changed them all again at 175,000. newer rotors, calipers are a few years old, flushed brake fluid. new brakes a month ago, new PA inspection  ( in PA they go over vehicles with a fine tooth comb) it needed a wheel bearing that I had the mechanic do. oil and fuel filter was just changed.
I do have a have a Predator programmer that can go with the truck if you want. I also a plow that is solid. I only ever plowed my driveway NO commercial plowing I will leave the plow on for an additional $1000 other wise the plow will be removed and is not included.
197,400 miles but this is my daily driver and I drive between 250-300 miles/wk. so there will be additional miles.
I will deliver up to 100 mile for free.
I have a video one you tube search Duramax for sale 05'

$500 deposit with in 48 hours full payment within 7 days

Auto Services in Pennsylvania

Wyoming Valley Kia - New & Used Cars ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 560 Pierce St, Shavertown
Phone: (570) 714-9924

Thomas Honda of Johnstown ★★★★★

New Car Dealers
Address: 1920 Bedford St, Beaverdale
Phone: (814) 262-2140

Suder`s Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automotive Tune Up Service
Address: 1315 Randall Ave, Wycombe
Phone: (215) 949-1182

Stehm`s Auto Repair ★★★★★

Auto Repair & Service
Address: 1601 Cinnaminson Ave, Andalusia
Phone: (866) 595-6470

Stash Tire & Auto Service ★★★★★

Auto Repair & Service, Tire Dealers, Mufflers & Exhaust Systems
Address: 939 Boston Hollow Rd, Mckeesport
Phone: (412) 754-1055

Select Exhaust Inc ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Mufflers & Exhaust Systems
Address: 5045 Pottsville Pike, Port-Clinton
Phone: (610) 916-1111

Auto blog

Next-gen Chevy Cruze caught cruising in the cold

Wed, 13 Feb 2013

Spy photographers have caught what looks like the next-generation Chevrolet Cruze out on snow patrol. The camo could be tricking our eyes, but it look like it has an even tidier, more rounded front end and even lower fenders in relation to the top of the hood. And either a chunk of camo has been wedged between the side mirrors and the doors, or the mirrors are up for revision, too.
The door handles have been moved up the side of the car, leading the way to a rear end that grows a bit in length. If the rumors are true, the coming second-generation Cruze sits on the new D2XX platform that will replace the Delta and Theta platforms at General Motors. A global architecture, the Cruze will be the first to get it, but it will underpin everything from next Chevrolet Volt to the Equinox and could be responsible for 2.5 million units by 2018. The next Cruze is expected to begin production in GM's Lordstown, Ohio plant in the third quarter of 2014.

2016 Chevy Volt arrives with 50-mile EV range, 41 mpg [w/ video]

Mon, Jan 12 2015

Let's start with the numbers. The 2016 Chevy Volt will have an all-electric range of 50 miles from a new, 18.4-kWh lithium battery. It will get 41 miles per gallon (combined) once the battery runs dry and have 102 MPGe. Oh, and it has five seats, sort of. To compare, today's four-seat 2015 Volt has a 38-mile range from a 17.1-kWh battery in a powertrain that offers 37 mpg and 98 MPGe. So, across the board, there are notable improvements. Now that that's out of the way, let's talk story. General Motors will unveil the new Volt at the Detroit Auto Show later today, but it's been talking about how this new version – the first major plug-in hybrid vehicle to get a serious redo in the modern era – was crafted with reams and reams of data from first-gen Volt customers. At a preview event for journalists last week, GM executive chief engineer Pam Fletcher told Autoblog that these owners "gave us the recipe" to make the second-gen model. At the top of the request list was more range (check), more "fun-to-drive" behavior (check?) and a smoother and quieter experience (we'll assume a check here, given that the new 1.5-liter four-cylinder – the first North American application of this new engine family – should offer more power with less noise than the previous 1.4-liter, four-cylinder powerplant). Other customer-driven changes in the new Volt include a different place to store the charging cable (in the side of the trunk instead of under the load floor) and a new brake system with improved blended regenerative braking feel as well as driver-selectable regen levels. The requested 50-mile range comes from a new, lighter battery that has increased capacity from fewer cells (192 vs. 288) and a simplified control architecture. Along with the new battery, the electric drive unit is a two-motor deal that is up to 12 percent more efficient and 100 pounds lighter, while also being "tremendously smaller," notes Fletcher. It offers 294 pound-feet of torque and a maximum 149 horsepower of "motoring power" delivered to the wheels. GM says it has worked hard to reduced the amount of rare earth materials in these motors, and one of them doesn't use any at all. The new powertrain offers improved acceleration times, as well. The 2016 Volt can go from 0 to 60 miles per hour in 8.4 seconds, a seven-percent improvement, while the 0-30 mph time has been improved by 19 percent, down to 2.6 seconds. The new Volt is more conventional looking, but certainly not completely ordinary.

Here are 12 electric pickups in the works

Wed, Oct 21 2020

With the unveiling of the GMC Hummer EV, the list of planned electric pickups is expanding. Legacy automakers like Ford and Chevy have theirs coming, as do startups like Tesla, Rivian and Bollinger, as well as some lesser known brands. Here are all the electric pickup trucks we know to be in the works, along with a few that are being discussed or mulled over. GMC Hummer EV The 2022 GMC HUMMER EV is a first-of-its kind supertruck develop View 40 Photos We’ve seen it now, and itÂ’s the business. The GMC Hummer EV comes out swinging with 1,000 horsepower from GMÂ’s new Ultium electric powertrain program, a wealth of off-road features, a removable roof, Super Cruise and the revival of the Hummer name. WeÂ’ll see the first ones on the road next fall. Tesla Cybertruck Tesla Cybertruck at the Petersen Museum View 14 Photos Tesla revealed the Cybertruck last year with, ahem, unique styling, a number of powertrain options and a claimed range of up to 500 miles. It has a compressed paper dash, a ramp for the bed, and “shatterproof” windows. It has already racked up hundreds of thousands of reservations. It will be built in Texas. Rivian R1T 2021 Rivian R1T View 15 Photos EV startup Rivian revealed its R1T electric pickup toward the end of 2018 with a claimed 0-60 time of 3 seconds and a towing capability of 11,000 pounds. Preproduction began in September 2020 at RivianÂ’s factory in Normal, Illinois. Bollinger Motors B2 Bollinger Motors B2 side outdoors View 31 Photos BollingerÂ’s B2 electric pickup is a Class 3 off-roader with retro styling, removable roof panels, and a unique “frunkgate” with a pass-through down the center of the vehicle. It was created with both enthusiasts and workers in mind, with features that can get it to remote places (portal axles, hydro-pneumatic suspension) and to get things done (room for 40 2x4s, equipped with eight 110-volt outlets and one 220-volt outlet). Bollinger also plans to make the B2 Chassis Cab available for fleet customization. Ford F-150 Electric Electric Ford F-150 Towing View 9 Photos WeÂ’ve known this to be in the works since early 2019. Since then, details have trickled out. Back in June, Ford announced its F-150 Electric would be coming within two years. WeÂ’ve seen it pull a million pounds worth of train and trucks, heard it will have more power than any other F-150, and seen its LED-laden front end.