Find or Sell Used Cars, Trucks, and SUVs in USA

2006 Chevrolet Silverado 2500 Lt on 2040-cars

US $18,000.00
Year:2006 Mileage:54259 Color: Gray /
 Gray
Location:

Sheldon, Wisconsin, United States

Sheldon, Wisconsin, United States

ANY QUESTIONS JUST EMAIL ME: endaemmarlo@boyracer.net .

2006 one of a kind mint condition pre emissions lbz chevy duramax 55k original miles cleanest 06 in the country

Auto Services in Wisconsin

Wrench`s Repair ★★★★★

Auto Repair & Service
Address: 605 Schoenhaar Dr, West-Bend
Phone: (262) 338-0983

Superior Automotive ★★★★★

Auto Repair & Service
Address: 417 Main St E, Moquah
Phone: (715) 682-4000

Southside Tire Co Inc ★★★★★

Automobile Parts & Supplies, Tire Dealers, Automobile Accessories
Address: 4411 Meridian Drive, Windsor
Phone: (608) 648-6800

Shawano Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Towing
Address: 315 S Main St, Shawano
Phone: (715) 526-9944

Sedlak Chevrolet Buick ★★★★★

New Car Dealers, Used Car Dealers
Address: 8240 US Highway 51 S, Arbor-Vitae
Phone: (715) 356-3262

Quince Auto Sales ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 1502 Shirland Ave, Janesville
Phone: (815) 389-2253

Auto blog

LG Chem's troubled Chevy Volt battery plant hiring once again

Thu, Sep 25 2014

The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.

2013 Chevy COPO Camaro announced with two new engines and manual option

Thu, 07 Mar 2013

Chevrolet is following up the 2012 COPO Camaro with another limited run of the drag-strip-ready production car for 2013. Ditching the superchargers, the 2013 COPO Camaro can only be equipped with one of three naturally aspirated V8 engines, and other new features include the option of a manual transmission, new front springs, some minor styling changes and a lower starting price of $86,000. All cars are designed to abide by the rules of the NHRA's Stock Eliminator or Super Stock classifications, depending on in which series buyers wish to enter their Chevrolet Camaro.
Returning for 2013 is the 427-cubic-inch V8 producing 425 horsepower, but the new engines include a 325-hp 350-CID V8 and a 375-hp 396-CID V8. Buyers can select to purchase all three engines, and each will be matched with the sequence number of that car; the track-only COPO cars will not have vehicle identification numbers and can't be registered for street use.
Chevrolet is also offering unique enthusiast-specific options such as a COPO Build Book and the opportunity for owners to help assemble their car's engine at the Chevrolet Performance Build Center in Wixom, MI.

GM laying off 500 workers to slow Chevy Sonic production

Sat, Oct 24 2015

Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.