Find or Sell Used Cars, Trucks, and SUVs in USA

2015 Chevrolet Silverado 1500 Lt Crew Cab Pickup 4 on 2040-cars

US $14,000.00
Year:2015 Mileage:2320 Color: Gray
Location:

Springfield, Massachusetts, United States

Springfield, Massachusetts, United States

eMail me for more details : gerri953r3ciko@hotmail.com The truck had light front damage I replaced the Hood, LH fender, LH headlight, Bumper and grill. The truck had New Car replacement insurance coverage from the previous owner so it was paid off and had Zero frame damage it was a high hit above the rails and suspension as you can see from the last picture. The truck still smells Brand New inside and has all brand new GM replaced parts at a GM dealer body shop I have all receipts. Please no low ballers and no dreamers or trades - I build these trucks as a hobby in my retirement and Im in no rush to sell it. I will wait for the right buyer, who has the funds and does not have to ask mommy aka his wife for permission.

Auto Services in Massachusetts

Woody`s Tire Service ★★★★★

Auto Repair & Service, Tire Dealers, Tire Recap, Retread & Repair
Address: 80 Garden St, Belmont
Phone: (978) 674-7550

Walnut Hill Auto Body ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 235 Lowell St, Somerville
Phone: (978) 674-7550

Sudbury Volvo Service ★★★★★

Auto Repair & Service, New Car Dealers
Address: 684 Boston Post Rd, Lexington
Phone: (978) 443-3833

Southeast Truck Ctr Inc ★★★★★

Automobile Parts & Supplies, New Truck Dealers, Truck Equipment & Parts
Address: 147 State Rd, Monument-Beach
Phone: (508) 888-1977

Sal`s Auto & Truck Repair ★★★★★

Auto Repair & Service, Towing
Address: Ashby
Phone: (978) 263-2614

S & L Auto Service ★★★★★

Auto Repair & Service, Auto Oil & Lube
Address: 16 Southbridge Rd, Whitinsville
Phone: (508) 461-9950

Auto blog

Final C6 Corvette built in Bowling Green

Fri, 01 Mar 2013

With all of the attention given to the 2014 Chevrolet Corvette Stingray lately, you could be forgiven for thinking that it's already well along in production, yet tooling up for the new C7 has only just begun. In fact, production of the outgoing C6 generation in Bowling Green, Kentucky just halted on Thursday.
As the C6 has aged, production numbers have predictably ebbed along with demand, but this year, the addition of the 427 and 60th anniversary models resulted in an uptick in vehicles built - this, despite a model year shortened by around 25 percent to accomodate the new model changeover. The final C6 Corvette ever, No. 13,466 built this year, was a white 427 Convertible destined for the General Motors Heritage Center museum. The car's 7.0-liter V8 heart was assembled by Corvette chief engineer Tadge Juechter himself.
In total, Bowling Green pushed out 215,100 C6 Corvettes over nine years. If you're still a C6 fan at heart and are hoping to get a good deal on a phase-out model, step lively - Chevrolet reportedly had about 6,100 unsold units, which Autoweek suggests is good for around five and a half months of supply at the model's current sales rates. Given that demand will likely slacken even further as the C7 draws closer, that should be a big enough stockpile to keep dealers satisfied until 2014 Stingrays begin showing up on their forecourts in December.

2015 Chevy Spark will have lighter, smaller battery

Thu, May 15 2014

As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.