2014 Chevrolet Silverado 1500 Lt on 2040-cars
1401 Vaughn Rd, Wood River, Illinois, United States
Engine:5.3L V8 16V GDI OHV
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GCVKREC2EZ198221
Stock Num: 25571
Make: Chevrolet
Model: Silverado 1500 LT
Year: 2014
Exterior Color: Blue Granite Metallic
Interior Color: Jet Black
Options: Drive Type: 4WD
Number of Doors: 4 Doors
Chevrolet Silverado 1500 for Sale
2014 chevrolet silverado 1500 lt(US $44,730.00)
2014 chevrolet silverado 1500 lt(US $45,355.00)
2014 chevrolet silverado 1500 lt(US $47,205.00)
2014 chevrolet silverado 1500 high country(US $51,070.00)
2014 chevrolet silverado 1500 work truck(US $27,455.00)
2014 chevrolet silverado 1500 work truck(US $28,925.00)
Auto Services in Illinois
Zeigler Chrysler Dodge Jeep ★★★★★
Walden Automotive ★★★★★
Twin City Upholstery Ltd. ★★★★★
Truetech Automotive ★★★★★
Towing Recovery Rebuilding Assistance Services ★★★★★
Tony`s Auto Body ★★★★★
Auto blog
LG Chem's troubled Chevy Volt battery plant hiring once again
Thu, Sep 25 2014The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.
GM pickup truck plant in Flint to add 1,000 assembly workers
Tue, Feb 5 2019FLINT, Mich. — General Motors said Tuesday it will add 1,000 workers to build new heavy-duty pickup trucks at its plant in Flint, Michigan, and will give priority to GM workers who were laid off elsewhere. The announcement comes the day after GM said it was starting to hand pink slips to about 4,000 salaried workers in the latest round of a restructuring announced in late November that will ultimately shrink its white-collar workforce in North America by 15 percent out of 54,000. GM has come under fire from U.S. President Donald Trump and Midwestern lawmakers for its plans to stop production at five North American factories and cut up to 15,000 jobs in all. The automaker has said it is trying to find new jobs for 1,500 U.S. hourly workers at the affected plants. Flint's truck plant could be a haven for many of these employees. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday will celebrate the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. Elsewhere in the company on Monday, two people briefed on the cuts in the white-collar salaried workforce said GM is cutting hundreds of jobs at its information technology centers in Texas, Georgia, Arizona and Michigan and more than 1,000 jobs at its Warren, Michigan Tech Center. GM is filing new required mass layoff notices with state agencies and disclosed the cuts to lawmakers. The largest U.S. automaker announced in November it would cut a total of about 15,000 jobs and end production at five North American plants. The cuts include eliminating about 8,000 salaried workers, or about 15 percent. GM cut about 1,500 contract workers in December and said 2,300 salaried workers accepted buyouts, officials said. "These actions are necessary to secure the future of the company, including preserving thousands of jobs in the U.S. and globally. We are taking action now while the overall economy and job market are strong, increasing the ability of impacted employees to continue to advance in their careers, should they choose to do so," GM spokesman Pat Morrissey said, adding the bulk of the cuts should be completed in the next two weeks. Morrissey said GM would provide salaried workers with severance packages and job placement services.
GM recalls Chevy Express, GMC Savana over rollaway concern
Mon, 21 Jan 2013The National Highway Traffic Safety Administration has issued a recall notice for a small number of General Motors fullsize vans due to possible rollaway concerns. On certain 2013 Chevrolet Express and 2013 GMC Savana models, it is possible to remove the key from the ignition without the shifter being in park.
Only 980 total units are being affected by this recall, and GM is fixing the issue by replacing the ignition cylinder and associated keys. Affected Chevy vans were built during most of November and December while its GMC counterpart was only built for a week in November. The recall goes into effect on January 23, and to find out if your vehicle applies to the recall, the GM and NHTSA contact numbers can be found on the official recall notice, which is posted below.