Find or Sell Used Cars, Trucks, and SUVs in USA

2002 Chevrolet Silverado 1500 Ls Rwd Cdplayer Autotrans Ac We Finance!! on 2040-cars

US $7,400.00
Year:2002 Mileage:95833 Color: Blue /
 Black
Location:

Bedford, Ohio, United States

Bedford, Ohio, United States
Advertising:
Body Type:Pickup Truck
Vehicle Title:Clear
Engine:6
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
VIN: 2GCEC19W221158454 Year: 2002
Make: Chevrolet
Warranty: Vehicle does NOT have an existing warranty
Model: Silverado 1500
Mileage: 95,833
Sub Model: LS
Disability Equipped: No
Exterior Color: Blue
Doors: 2
Interior Color: Black
Drive Train: Rear Wheel Drive
Inspection: Vehicle has been inspected
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Chevrolet Silverado 1500 for Sale

Auto Services in Ohio

Zig`s Auto Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Driveshafts
Address: 3340 Elyria Ave, Amherst
Phone: (440) 244-0130

Zeppetella Auto Service ★★★★★

Auto Repair & Service, Gas Stations, Tire Dealers
Address: 28233 Lorain Rd, Strongsville
Phone: (440) 777-8720

Willis Automobile Service ★★★★★

Auto Repair & Service
Address: 3505 Sunflower Rd, Calcutta
Phone: (724) 846-4831

Voss Collision Centre ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 94 Loop Rd, Springboro
Phone: (866) 413-0479

Updated Automotive ★★★★★

Auto Repair & Service, Automobile Diagnostic Service, Brake Repair
Address: 12146 York Rd, N-Ridgeville
Phone: (440) 582-1992

Tri C Motors ★★★★★

New Car Dealers, Used Car Dealers
Address: 22521 State Route 62, Maximo
Phone: (330) 821-5488

Auto blog

Weekly Recap: GM plans massive new paint shop at Chevy Corvette factory

Sat, May 23 2015

General Motors is laying out some serious green to maintain the Chevy Corvette's expansive color palette. The automaker is breaking ground on a new paint shop this summer that's part of a $439-million investment to upgrade the 34-year-old Bowling Green, KY, factory that builds the Stingray. The massive new structure will total 450,000 square feet, nearly half the size of the current 1-million square-foot facility. Construction is expected to take two years and won't impact Corvette production. The upgrades include new robots that save paint and create a better finish, longer, more efficient ovens to bake in the finish, and LED lighting. There's also a dry scrubbing booth technology with a limestone handling system that eliminates waste. GM has invested $135 million in the factory in last four years for the changeover to build the C7 and to relocate its Performance Build Center to Bowling Green. The improvements continue to modernize the Kentucky factory, which has become a tourist attraction in its own right, as more than 56,000 enthusiasts visited it last year. The upgrades are part of a $5.4-billion investment GM confirmed in April that will remake its US footprint in the next three years. The Bowling Green expansion underscores GM's continued commitment to the Corvette, which sold nearly 38,000 copies around the world last year, an eight-year high. "With this major technology investment, we can continue to exceed the expectations of sports car buyers for years to come," North American manufacturing manager Arvin Jones said in a statement. OTHER NEWS & NOTES Takata recall hits 34 million vehicles The National Highway Traffic Safety Administration expanded the Takata airbag recall to an almost unthinkable 34 million vehicles on Tuesday. The recall is part of an agreement reached by the two sides where Takata admitted some of its airbag inflators have a defect, and the deal compels the company to comply with all future regulatory actions and investigations. Takata's airbag inflators were produced with "a propellant that can degrade over time" and lead to ruptures, NHTSA said. Six deaths have been attributed to the flaw worldwide. Investigations conducted by Takata, automakers, and others have not determined the exact cause of the inflator problem, but NHTSA said moisture appears to alter the propellant's chemical structure. It then ignites too rapidly, creates too much pressure that ruptures the inflator, and blasts shards of metal at passengers.

GM will make Chevy Volt production announcement tomorrow

Mon, Apr 7 2014

Thing are apparently happening to get the next-generation Chevy Volt ready for public consumption. The most obvious proof is in a preview of an announcement (possibly coming tomorrow) that the two main places where General Motors gets the Volt ready -the Detroit-Hamtramck Assembly Plant and the Brownstown Township battery assembly facility - will be getting big money upgrades and lots of new positions. The Hamtramck plant builds the Volt and its fancier cousin, the Cadillac ELR, as well as the global versions of the Volt. The Detroit News reports that GM will add 1,400 jobs and spend roughly $450 million at the two locations in order to build the redesigned Volt. What's less clear is exactly what the updates will bring us. We've heard that the new volt will be a 2016 model and come on a new chassis. Speculation in The Detroit News about tomorrow's announcement runs the gamut from a new compact PHEV with less electric range and a lower price (which makes sense) to an updated Volt with more electric range (heard it before) to a new all-electric vehicle (the moon shot). If there's any hints to be gleaned in the international Volts, there are also reports coming in that the Opel brand will get an all-electric vehicle that is cheaper than the Ampera. Read into that what you will. We pestered GM's Kevin Kelly on the new Volt (again) and he said (again) that he couldn't give out any more detail other than what's been reported. He just told AutoblogGreen that there will be an announcement tomorrow and that it will be about the Hamtramck and Brownstown facilities and involve the Volt. So, stay tuned.

GM laying off more than 4,000 workers Monday morning

Sat, Feb 2 2019

According to reports from Automotive News, The Detroit News, and CNN, General Motors plans to begin laying off more than 4,000 salaried workers starting Monday morning. In a statement to AN, a spokesperson for the automaker said, "We are not confirming timing. Our employees are our priority. We will communicate with them first." We've been expecting layoffs at General Motors since November, 2018. At the time, the Detroit-based automaker announced it would seek to shed 8,100 salaried employees, shut down five assembly plants in North America, and kill off several slow-selling models. One month earlier, GM offered buyout packages to 18,000 workers and said it would seek to cut its global workforce by 25 percent. A spokesperson said at the time the moves were "proactive steps to get ahead of the curve by accelerating our efforts to address overall business performance." The cost-cutting moves are expected to save GM up to $2.5 billion in 2019 and as much as $6 billion by 2020. David Kudla, CEO and chief investment strategist of Mainstay Capital Management, referred to the impending culling as "Black Monday" and told The Detroit News that the layoffs would begin around 7:30 a.m. and continue in waves throughout the coming days and weeks. GM plans to deliver on its fourth-quarter and full-year 2018 earnings report on Wednesday. President Donald Trump plans to deliver the annual State of the Union address a day earlier on Tuesday. We expect to hear plenty more from both sides over the next several days.