Find or Sell Used Cars, Trucks, and SUVs in USA

1986 Chevy C30 Scottsdale 1ton Box Truck Lift Gate, Water Tank Concrete Drill Nr on 2040-cars

Year:1986 Mileage:169000
Location:

Huntington Beach, California, United States

Huntington Beach, California, United States
Advertising:

Auto Services in California

Yoshi Car Specialist Inc ★★★★★

Auto Repair & Service
Address: 15 Auburn Ave, Baldwin-Park
Phone: (626) 355-2553

WReX Performance - Subaru Service & Repair ★★★★★

Auto Repair & Service
Address: 611 Galaxy Way, Salida
Phone: (209) 661-1017

Windshield Pros ★★★★★

Auto Repair & Service, Windshield Repair, Windows
Address: 7500 Folsom Blvd, Gold-River
Phone: (916) 381-8144

Western Collision Works ★★★★★

Automobile Body Repairing & Painting
Address: 709 N Gramercy Pl, Commerce
Phone: (323) 465-2100

West Coast Tint and Screens ★★★★★

Auto Repair & Service, Door & Window Screens, Window Tinting
Address: Dulzura
Phone: (760) 471-8939

West Coast Auto Glass ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 9157 W Sunset Blvd, Century-City
Phone: (323) 332-6015

Auto blog

GM to build outgoing Silverado and Sierra until late 2019

Tue, Nov 6 2018

As it has done with previous generations, General Motors is keeping the outgoing versions of its 1500 pickups in production despite the arrival of the all-new 2019 Chevrolet Silverado and 2019 GMC Sierra. The production of the previous, K2 generation models will begin to be wound down gradually, according to Automotive News, starting with crew cabs "early next year," and double and regular cab models following during "the early second half of next year." The old model trucks will continue to be built into "late 2019" based on market demand, GM's spokesperson Kim Carpenter said. The Chevrolet will go by the name Silverado LD, with the GMC Sierra designation still to be announced. Some of the outgoing models are built by sharing the assembly work between two GM plants. Partially finished Silverado and Sierra double cab bodies are shipped from Fort Wayne, Ind., to Oshawa, Ont., where the trucks are completed, including receiving paint. This eases the workload in Fort Wayne, where production of the new T1 generation trucks started in July 2018. In January, the Silao plant in Mexico will take on the duties of building new generation regular cab and crew cab trucks. Carpenter also said that the "Oshawa shuttle," as the shared production is called, has been very successful. As a result, 60,000 more trucks will be built than what the original production forecast initially called for. GM's latest quarterly profits, disclosed last week to be $1 billion, have been far higher than expected and will result in full-year profits far higher than what had been predicted in light of steel tariffs. GM isn't the only truck maker taking a similar multi-generation approach for 2019. Both the outgoing and redesigned Ram 1500 are in production, with the previous generation being dubbed Ram 1500 Classic. Related Video:

Sinkhole Opens Up In National Corvette Museum, Swallows Eight Cars

Wed, Feb 12 2014

More cars are being moved inside the National Corvette Museum in Bowling Green, Ky. to avoid falling down the same sinkhole that swallowed eight classic sports cars early this morning, Autoblog reported. Museum officials said the hole was discovered when motion sensors activated around 5:45 a.m. The rescue mission can be viewed on the museum's live feed cameras, which weren't working after the sinkhole emerged. A 1993 ZR-1 Spyder and a 2009 ZR1 "Blue Devil," both on loan from General Motors, were among the cars that fell into the sinkhole. The museum owned the other affected Corvettes, which included a 1963 Corvette, a 1984 PPG Pace Car and the 1 millionth Corvette ever produced. The state of the cars at the bottom of the hole isn't known, but trial lawyer and sinkhole expert Ted Corless said the cars may be a total loss for the museum and GM. "Most states, including Kentucky, exclude damage caused by sinkhole activity," he said. "There will be, in all likelihood, a claim made, but a lot of policies would specifically exclude these kinds of damages." Corless has 15 years experience dealing with sinkholes. He said that typically neither the building, nor the cars themselves are protected under their insurance policies. "I would have to say, more likely then not, they're going to have an uninsured loss measured in the hundreds of thousands of dollars." The museum is closed Wednesday while a structural engineer assesses the damage. Related Gallery 2014 Chevrolet Corvette Stingray Test Drive View 9 Photos Related Gallery 2014 Chevrolet Corvette Stingray Test Drive View 9 Photos Weird Car News Chevrolet GM corvette

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.