1950 Chevy 3100 Hot Rod Rat Pickup Truck Patina Shop Air Ride Bagged C10 Hotrod on 2040-cars
Lexington, Kentucky, United States
Chevrolet Other Pickups for Sale
- 1951 chevy 3100 hot street rod rat pickup truck patina shop c10 pro tour cold ac
- 1959 chevrolet apache 3100 big window pickup 283 3 speed air conditioning
- 1950 chevy pickup 3600 1947 1948 1949 1951 rat rod patina gmc
- 1937 chevy pick up 383 4wdb vintage ac power rack & pinon steering street rod
- 1986 chevrolet c30 1 ton truck
- 1955 chevrolet 3100 pickup truck stepside w/ factory v8 option & big back window
Auto Services in Kentucky
Tire Discounters INC ★★★★★
Thompson Transmission & Auto Service ★★★★★
Southern Rides ★★★★★
Quality Automotive ★★★★★
ProTouch Quality Auto Cleaning Polishing & Window Tinting ★★★★★
Probilt Automotive ★★★★★
Auto blog
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly
GM diesel pickups first to undergo extra EPA, CARB testing
Tue, Sep 29 2015The effects of Volkswagen's long-running diesel emissions evasion are starting to spill over to other automakers, but General Motors is taking things in stride. The 2.8-liter, four-cylinder Duramax in the 2016 Chevrolet Colorado and GMC Canyon is the first engine to get extra scrutiny by the Environmental Protection Agency and the California Air Resources Board, Automotive News reports. Rather than just the usual in-lab test, it's also being checked on the road. However, the extra evaluation shouldn't have any impact on when the trucks with his mill hit dealers later this fall. "We're in our final stages of the EPA certification, and our launch is on track," Chevy spokesperson Otie McKinley tells Autoblog. The four-cylinder diesel in the trucks makes 181 horsepower and 369 pound-feet of torque, and the automaker is touting low NOx production. In the announcement for the Colorado's specs, the company calls it "the cleanest diesel truck engine ever produced by General Motors." The tech includes exhaust gas recirculation to lower combustion temperatures and improve emissions. There's also a urea tank like on the bigger diesels for full-size trucks, and it gets refilled in time with oil changes. An indication on the instrument panel lets drivers know when that's needed, too. Even with the more demanding testing, the company doesn't seem too worried about the four-cylinder passing. "Part of our development process is on-road and off-road [laboratory] testing," Scott Yackley, Chevy Trucks assistant chief engineer, said to Automotive News. In the wake of the VW scandal, the EPA has pledged more rigorous testing. Before, on-road emissions evaluations were largely limited to heavy-duty vehicles, but the agency has decided to apply the checks more often to other models. There's also now greater cooperation with Canadian authorities.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.