67 Chevy Nova Prostreet on 2040-cars
Kemah, Texas, United States
Body Type:Coupe
Engine:383 Stroker with 871 blower
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Interior Color: Black
Make: Chevrolet
Number of Cylinders: 8
Model: Nova
Trim: 2 door
Drive Type: RWD
Mileage: 0
Exterior Color: Black
Number of Doors: 2
Chevrolet Nova for Sale
- 1972 nova ss
- 1970 chevrolet nova super sport 53k miles, stunning show condition, texas car(US $29,500.00)
- 1972 chevrolet nova(US $32,000.00)
- 1973 chevrolet nova custom coupe 2-door super sport(US $4,500.00)
- 1966 chevy ii nova ss 406 custom musclecar / video
- 1976 chevrolet nova 2 door coupe 305(US $5,750.00)
Auto Services in Texas
Woodway Car Center ★★★★★
Woods Paint & Body ★★★★★
Wilson Paint & Body Shop ★★★★★
WHITAKERS Auto Body & Paint ★★★★★
Westerly Tire & Automotive Inc ★★★★★
VIP Engine Installation ★★★★★
Auto blog
Corvette Stolen In Detroit Returned To Owner After 33 Years
Wed, Jun 25 2014A Detroit man had his stolen Corvette returned 33 years after it disappeared while parked on one of Detroit's main drags, according to ABC 7. The last time George Talley saw his 1979 Corvette was on a July day in 1981, when it disappeared from its parking spot on Jefferson Avenue in Detroit. He had given up hope of ever seeing his car again, until a phone call from AAA brought his sporty ride home. Authorities had come across a Corvette with a questionable VIN in Hattiesburg, Mississippi. When they ran the number Talley's stolen car report came up. The car is still in pretty good shape and only has 47,000 miles on the odometer. Talley wasn't sure how he could get the car back home, but General Motors stepped in and agreed to cover the cost of bringing the 'Vette home. Talley has always had a passion for Detroit-made muscle cars. "I've always liked Corvettes. It was attractive. The ladies like 'em," Talley told ABC 7.
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Mysterious white powder discovered at GM Orion Assembly
Fri, Sep 2 2016Workers at General Motors Orion Assembly Plant in Orion Township, MI uncovered a mysterious white powder in two different parts of the factory earlier this week, raising concerns about worker safety. "We can confirm that an unknown substance (white powder) was found on the floor outside of Gate 6 at Orion Assembly on Monday, August 29. On Tuesday, August 30, we had a second report of a bottle containing a similar substance found inside the plant," GM spokesperson Dayna Hart told The Oakland Press via email. GM stressed that incident didn't disrupt operations at the plant, and that the company was taking steps to ensure the safety of the sprawling factory's workers. That did include, an anonymous worker told The Oakland Press, closing off parts of the factory for two full days, as drug-sniffing dogs and crews in haz-mat suits descended on the area. "A sample of the substance has been sent to a laboratory for identification and results are expected later this week," Hart said. "All findings and actions have been shared with our employees." Orion Assembly currently builds the Chevrolet Sonic and Buick Verano, and will eventually be responsible for production of the new, all-electric Chevy Bolt early next year. Related Video: