Find or Sell Used Cars, Trucks, and SUVs in USA

2004 Chevrolet Malibu Maxx Lt Hatchback 4-door 3.5l on 2040-cars

US $4,500.00
Year:2004 Mileage:98000
Location:

Easton, Pennsylvania, United States

Easton, Pennsylvania, United States
Advertising:

For sale is a 2004 Malibu Maxx LT Hatchback, fully loaded and in great condition!

Asking $4,500 O.B.O. which is lower then the KBB value.

Includes:

3.5L V6 Engine
Automatic Transmission
Power Windows
Power Locks With Keyless Remote 
Power Mirrors
Cruise Control
CD & DVD Player
Front Sun Roof
Rear Moon Roof
Heated Electric Front Seats
Auto Dimming Inside Mirror
Fog Lights

Plus Many More...

Auto Services in Pennsylvania

Walburn Auto Svc ★★★★★

Auto Repair & Service
Address: 1261 Scott St, Hegins
Phone: (570) 797-1577

Vans Auto Repair ★★★★★

Auto Repair & Service
Address: 990 Bears Den Rd, Wheatland
Phone: (330) 799-2771

United Automotive Service Center LLC ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Wheel Alignment-Frame & Axle Servicing-Automotive
Address: 1135 Wayne Ave, Shady-Grove
Phone: (717) 977-3052

Tomsic Motor Co ★★★★★

New Car Dealers, Used Car Dealers, Automobile Parts & Supplies
Address: 150 Racetrack Rd, Claysville
Phone: (724) 228-1330

Team One Auto Group ★★★★★

Auto Repair & Service
Address: 440 Loucks Rd, Dover
Phone: (717) 846-8326

Suburban Collision Specs Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 210 N Chester Pike, Chester
Phone: (610) 461-2700

Auto blog

Chevy Chaparral 2X Vision Gran Turismo concept blends the past and the future

Wed, 19 Nov 2014

The Chevrolet Chaparral 2X Vision Gran Turismo is the rare concept car that salutes a seminal moment in history, yet also borders on science fiction.
Revealed Wednesday at the Los Angeles Auto Show, the concept uses the name of one of Chevy's historic racing partnerships, with Chaparral Racing, which dates to the 1960s. Chaparrals raced successfully at a range of levels, including IndyCar, Trans-Am and SCCA competition.
But the history ends there, as the concept's main purpose is as a racecar in a downloadable update for the PlayStation 3 game Gran Turismo 6.

Did the Chevy Corvette Z06 break 7 minutes at the Ring? Not likely

Wed, Jan 28 2015

"Just because it's on the internet doesn't make it true." That's rule number one, two and arguably, three, of surfing the world wide web. In today's example of this rule, we have the following. The website HorsepowerKings is claiming that a 2015 Chevrolet Corvette Z06, with the eight-speed automatic and Z07 package, managed to lap the Nurburgring Nordschleife in under seven minutes. To put that in perspective, that super-quick time would put the 650-horsepower, $97,000 (the price of a 2LZ with the Z07/8AT combo) Z06 a mere two seconds slower around the world's most challenging race track than the $929,000, 887-horsepower Porsche 918 Spyder Weissach. It's about eight seconds quicker than Nissan's own test of the GT-R Nismo Track Pack and 13 seconds faster than a Dodge Viper ACR. Unfortunately, Chevy says there isn't anything to it. We reached out to the Bowtie's Monte Doran, who confirmed that HK's claims are "not accurate." "Any one – a manufacturer, a journalist, a guy standing on the fence of the Ring – can claim a lap time. As such, we think the in-car video is essential to proving a time is real and credible, and Chevrolet will not release a lap until we have a video to substantiate the claim," Doran told Autoblog. "Chevrolet accumulated nearly 1,000 miles of testing on the Nurburgring with the Z06. During that time, we only had two opportunities to run a lap on video – and both were rained out. If we get a lap on video, we will post an official time." Doran finished by referencing the "only official lap time" for the Z06 – a 2:41 around the Virginia International Raceway. Frankly, we aren't terribly surprised by Chevy's position. One would imagine if the Z06 were matching million-dollar hypercars around the 'Ring, the company would literally be screaming about it from Renaissance Center's rooftop. As this is quite the opposite of that, though, we're betting that the real Z06 lap time - while still likely very, very fast – won't be quite quick enough to frighten the brightest and best of today's hypercars.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.