Find or Sell Used Cars, Trucks, and SUVs in USA

1958 Chevrolet Impala Factory Black 348 Tri-power Positraction, 2 Door Hardtop on 2040-cars

Year:1958 Mileage:84297 Color: Black /
 Black
Location:

Lynnwood, Washington, United States

Lynnwood, Washington, United States
Advertising:
Transmission:Manual
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
VIN: E58J154272 Year: 1958
Number of Cylinders: 8
Make: Chevrolet
Model: Impala
Warranty: Unspecified
Mileage: 84,297
Sub Model: Hardtop
Exterior Color: Black
Interior Color: Black
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Washington

Westover Auto Rebuild ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Wheels-Aligning & Balancing
Address: 23765 SE 264th St, Black-Diamond
Phone: (425) 358-2472

vetter automotive ★★★★★

Auto Repair & Service, Brake Repair, Automobile Diagnostic Service
Address: 4135 sw hunter lane, Wauna
Phone: (360) 876-5500

Twin City Collision ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Truck Body Repair & Painting
Address: 8530A Cedarhome Dr, Stanwood
Phone: (360) 629-5152

Tru Line Frame & Wheel ★★★★★

Auto Repair & Service, Wheel Alignment-Frame & Axle Servicing-Automotive, Brake Repair
Address: 312 Boren Ave S, Retsil
Phone: (206) 325-3340

Troll Motors ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Parts & Supplies
Address: 1115 S Elizabeth St, Retsil
Phone: (206) 763-7222

Toby`s Battery & Autoelectric ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Battery Storage
Address: 3003 N Crestline St, Greenacres
Phone: (509) 252-0617

Auto blog

Next-gen Chevy Volt will get 1.5-liter, four-cylinder engine

Tue, Oct 28 2014

As General Motors gets ready to unveil the new Chevy Volt at the Detroit Auto Show in January, it's starting to reveal a few more details about the updated plug-in hybrid. Today should be fruitful on that front, thanks to an event GM is hosting today that focuses on the new Volt, and we've just had the first bit of new: a bigger engine is coming. Since the beginning, the Volt has used a 1.4-liter, four-cylinder engine as a range extender when the battery runs dry. The second-generation model will instead get a slightly larger 1.5-liter, four-cylinder engine that will be built in Flint, MI. That's a step up from the various engines that have been a part of the 2016 Volt's rumored mills, everything from a 1.0-liter or 1.2-liter three-cylinder to a 2.0-liter turbo. The confirmation about the new 1.5-liter powerplant was found in Automotive News, where we also heard again that GM is going to start building the new Volt's electric drive unit in Detroit, moving production up from Mexico. We will have more information on the 2016 Chevy Volt later today.

Autoblog Podcast #376

Wed, Apr 16 2014

Episode #376 of the Autoblog podcast is here, and this week, Dan Roth, Chris Paukert and Brandon Turkus talk about the New York Auto Show, internet criticism of the Ram Runner, and the 2014 Ward's 10 Best Interiors. We start with what's in the garage and finish up with some of your questions, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Check out the new rundown below with times for topics, and you can follow along down below with our Q&A. Thanks for listening! Autoblog Podcast #376: The video meant to be presented here is no longer available. Sorry for the inconvenience. Topics: New York Auto Show preview Ram Runner criticism Ward's 10 Best interiors for 2014 In the Autoblog Garage: 2014 Chevrolet Camaro 2SS 2014 Chevrolet Camaro 1SS 1LE 2014 Audi Q7 TDI Hosts: Dan Roth, Chris Paukert, Brandon Turkus Runtime: 01:37:18 Rundown: Intro and Garage - 00:00 New York Auto Show - 24:07 Ram Runner - 45:57 Ward's 10 Best Interiors - 57:00 Q&A - 01:14:02 Get the podcast: [UStream] Listen live on Mondays at 10 PM Eastern at UStream [iTunes] Subscribe to the Autoblog Podcast in iTunes [RSS] Add the Autoblog Podcast feed to your RSS aggregator [MP3] Download the MP3 directly Feedback: Email: Podcast at Autoblog dot com Review the show in iTunes Auto News Podcasts New York Auto Show Audi Chevrolet Off-Road Vehicles chevy camaro 1le wards 10 best interiors

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.