Find or Sell Used Cars, Trucks, and SUVs in USA

Chevrolet Express / Explorer Conversion Van / 100% Loaded / 1 Owner / 52k Miles on 2040-cars

Year:2002 Mileage:52287 Color: Silver /
 Gray
Location:

Richmond, Virginia, United States

Richmond, Virginia, United States
Advertising:
Transmission:Automatic
Body Type:Standard Passenger Van
Vehicle Title:Clear
Engine:5.7L 350Cu. In. V8 GAS OHV Naturally Aspirated
Fuel Type:GAS
For Sale By:Dealer
Condition:

Used

VIN (Vehicle Identification Number)
: 1GBFG15R221218025
Year: 2002
Make: Chevrolet
Model: Express
Warranty: Vehicle does NOT have an existing warranty
Trim: LT Standard Passenger Van 3-Door
Options: Leather Seats, CD Player
Drive Type: RWD
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Mileage: 52,287
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Exterior Color: Silver
Interior Color: Gray
Number of Cylinders: 8

Auto Services in Virginia

Wright Motors ★★★★★

Auto Repair & Service, New Car Dealers
Address: 901 E Laburnum Ave, University-Of-Richmond
Phone: (804) 477-6228

Warren James Auto Body & Towng ★★★★★

Automobile Body Repairing & Painting
Address: 6077 Rockfish Gap Tpke, Batesville
Phone: (434) 823-4261

VITRO Glass and Window Repair ★★★★★

Automobile Parts & Supplies, Glass-Auto, Plate, Window, Etc, Windows
Address: Arlington
Phone: (703) 944-2451

Valley Collision Repair Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Restoration-Antique & Classic
Address: 23101 Old Valley Pike, Elkton
Phone: (540) 459-2005

Valley Collision Repair Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Restoration-Antique & Classic
Address: 23101 Old Valley Pike, Washington
Phone: (540) 459-2005

Tyson`s Ford ★★★★★

New Car Dealers, Used Car Dealers
Address: 8201 Leesburg Pike, Greenway
Phone: (703) 448-0100

Auto blog

GM to squeeze out more production capacity for midsize trucks

Tue, May 26 2015

General Motors was predicting a strong showing for the Chevrolet Colorado and GMC Canyon before they debuted, and demand among dealers for the midsize trucks even exceeded company's expectations. The positive situation has left GM with a problem, though: finding ways to increase capacity for the pickups at the Wentzville Assembly plant in Missiouri. With a third shift already running, GM has continued to look for ways to build just a few more of the trucks at the plant. The company has plans to hire as many as 1,000 more workers for the Saturday and Sunday shifts to construct an additional 2,000 pickups a month, according to unnamed insiders at the factory speaking to Automotive News. The little adjustments even extend to getting rid of an unpaid break to add 18 minute of assembly time over the course of a day, which equals about 3,500 more vehicles a year. All of this effort comes because the trucks are in such high demand. According to GM's figures, the company has delivered a combined 35,720 units of the Colorado and Canyon from January through April 2015, and the Chevy was the fastest-selling truck in the US for the previous three months. In May, it spent an average of just 12 days in showrooms before being snapped up. And even better for the company, 43 percent of these buyers came from other brands. According to Automotive News, the most popular trade-ins have included the Ford F-150, Toyota Tacoma, and Dodge Dakota. Related Video:

GM, UAW poaching Nissan workers in Tennessee

Tue, Sep 8 2015

General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle