2001 Chevrolet Express Van Lt on 2040-cars
Utica, Michigan, United States
2001 Express LT Van Runs great! Selling as is ~ no warranty See original sticker with all features in the photos Known issues: CD is stuck in CD player. The AM/FM stereo works great. The VHS also works There is a short in the interior light; so the light does not go on. The rear door key entry does not work because someone tried to unsuccessfully break in. The door can be locked and unlocked using the interior door locks. Air conditioner needs a charge and works great with semi-annual charge Minor body dings and scrapes We are the original owners. The van has never been in any major accidents. We can provide records of oil changes, breaks, tires.... from Belle Tire (the only shop we used for the van) Most of the miles are highway miles. |
Chevrolet Express for Sale
1966 chevrolet g10 van base 3.8l
11 chev express 1500 cargo - one owner florida van - full cargo bin package(US $11,800.00)
2011 express g1500 custom mobile office van rear air! simply like new! must see!(US $21,900.00)
2008 chevy express 2500 6.0l v8 12-pass cruise ctrl 67k texas direct auto(US $14,780.00)
2006 chevrolet express 3500 cargo van 6.6l duramax turbo diesel 122k no reserve
2007 chevrolet express 3500 lt extended passenger van 3-door 6.0l(US $11,500.00)
Auto Services in Michigan
Wohlford`s Brake Stop ★★★★★
Wilder Auto Service ★★★★★
Valvoline Instant Oil Change ★★★★★
Trend Auto Sales ★★★★★
Transmission Authority ★★★★★
The Collision Shop ★★★★★
Auto blog
Chevy reveals new IndyCar aero package
Tue, Feb 17 2015The IndyCar Series is not one that demands its participating teams and automakers to design their own chassis as they do in Formula One, but for this season, the organizers have opened it up to allow for custom aero packages. What you're looking at here is the new look of the chassis to be fielded by teams running under Chevy power. Based on the Dallara DW12 chassis – introduced three years ago and named after the late Dan Wheldon – Chevy's new package is designed for road courses and short ovals, with the speedway configuration to be revealed later. The kit features new wings front and rear and more sculpted side pods. It's also got new wedges at the back to envelop the otherwise open wheels that are a hallmark of Indy racing, a more streamlined engine cover and bigger rear bumper pods. The new package will debut at the Grand Prix of St. Petersburg that will kick off this year's championship in Florida on March 29, followed by the road-course grands prix in Louisiana, Long Beach, Alabama and Indianapolis before the new package needs to be ready for the Indy 500 late in May. Half of the teams on the starting grid this season will be running under Chevy power and are expected to use this new aero kit, with the remaining Honda teams slated to run a different package of their own. Chevrolet Debuts All-New 2015 IndyCar Aero Package Chevy-developed bodywork delivers improved aerodynamics 2015-02-17 INDIANAPOLIS – Chevrolet-powered racecars in the 2015 Verizon IndyCar Series will feature Chevrolet-developed aero packages. Chevrolet introduced the road course/short oval body design today at the Indianapolis Motor Speedway. It is distinguished from the previous racecar with new front wing elements, sculpted side pods and a new rear wing. A speedway configuration for the aero kit, designed for high-speed ovals, will be introduced ahead of its competitive debut at Indianapolis in May. "This is an important milestone in Chevrolet's involvement in IndyCar racing," said Jim Campbell, General Motors U.S. vice president of Performance Vehicles and Motorsports. "We focused on developing an aerodynamic package that delivers an balanced combination of downforce and drag, along with integrated engine performance. It's a total performance package." The new Chevy road course aero configuration delivers greater aerodynamic performance than the previous design.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
Weekly Recap: Lamborghini to build SUV
Sat, May 30 2015Finally, Lamborghini will build a sport utility vehicle. The Italian supercar maker confirmed this week that it will launch a luxury SUV in 2018. It will be built at Lamborghini's soon-to-expand factory in Sant'Agata Bolognese in Italy, and will double the company's current sales volume. Lamborghini did not announce a name for the vehicle or other details, but noted a concept version, the Urus, was displayed at the Beijing motor show in 2012. It will be sold around the world, but it's expected to be a critical offering in the United States, China, and the Middle East. The automaker projects the SUV will sell about 3,000 units per year, and it will be the third product in Lamborghini's portfolio. It currently sells the Huracan and Aventador supercars. "The introduction of a third model line endorses the stable and sustainable growth of the company and signifies for us the beginning of a new era," Lamborghini chief executive Stephan Winkelmann said in a statement. The project is also a boon for Italy, which will get 500 new jobs in the Emilia Romagna region as Lamborghini's factory will nearly double in size. Ian Fletcher, principal analyst for IHS Automotive, said the SUV will position Lamborghini for future growth. "It could well also bring new customers to the brand [who] may find the dramatic styling of Lamborghini products appealing, but find its typical sports cars restrictive," he said. "If it is a success, the SUV could be a catalyst to Lamborghini broadening its portfolio further." OTHER NEWS & NOTES GM invests in Chevy Camaro factory General Motors is investing $175 million to upgrade its factory in Lansing, MI, to build the 2016 Chevy Camaro. The investment will pay for new tooling and equipment. The improvements include three new paint systems and two new robotic framers. GM will add a second shift at the factory to build the Camaro, resulting in 500 jobs. The automaker had dropped the plant to one shift last year amid slow sales for its products, the Cadillac ATS and CTS. GM is spending $5.4 billion over the next three years to upgrade its US facilities. Last week, GM announced plans to spend $439 million to build a new paint shop for the Chevy Corvette. While the Camaro and Corvette plant improvements are intriguing to enthusiasts, GM also confirmed this week that it is investing $1.2 billion in its Fort Wayne (IN) factory that builds trucks.