Silver Awd 4dr Suv Auxiliary Audio Input Back-up Camera Black Cloth Heated Seats on 2040-cars
Pikeville, Kentucky, United States
Chevrolet Equinox for Sale
2011 chevrolet equinox ltz sport utility 4-door 2.4l
2010 chevrolet equinox lt sport utility awd 3.0l one owner 42000 miles
2012 chevrolet equinox(US $16,500.00)
Runs good, no rust, 2 new front tires, awd, gold ext, tan int, am/fm cd(US $8,000.00)
Suv awd automatic clean cloth power locks & windows power adjustable driver seat(US $19,950.00)
14 equinox ls 4x2, 2.4l 4 cyl, auto, cloth, pwr equip, cruise, alloys, 1 owner!
Auto Services in Kentucky
United Van & Truck Parts ★★★★★
Tri-County Cycle Sales Inc ★★★★★
Top Dog Exhaust Ctr ★★★★★
Tire Mart ★★★★★
The Detail Guy ★★★★★
Stuart Powell Ford Inc. ★★★★★
Auto blog
GM recalls 8,500 Chevrolet Malibu models for rear suspension glitch
Mon, 04 Feb 2013According to a letter from General Motors to the National Highway Traffic Safety Administration, flaws in the build process of the 2013 Chevrolet Malibu have led to the recall of 8,519 cars. Units built between December 6, 2011 and January 15, 2013 may have been assembled with rear suspension cradles that had insufficient torque applied to certain bolts. That out-of-spec assembly could lead to issues ranging from slight noises to a loss of vehicle control.
The problem was first noticed in December of last year by a GM test fleet driver and eventually tracked back to the improperly torqued bolts on the suspension cradle assembled through July 2012 by a supplier located not too far from the Malibu's Detroit/Hamtramck Assembly Plant. Since an official NHTSA recall notice has not been issued yet, it isn't clear whether or not Detroit-built Malibus were the only ones affected (the 2013 Malibu is also built at GM's Fairfax Assembly Plant in Kansas City, Kansas). Dealers will fix the problem by inspecting vehicles for proper torque specs, retightening if not within specs and, in some cases, perform a rear-wheel alignment.
2015 Chevy Spark will have lighter, smaller battery
Thu, May 15 2014As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.
GM's Oshawa plant may close after Camaro production moves
Sat, Feb 7 2015Most of the time, when vehicle production is moved from one assembly plant to another, it spells bad news for the former. While General Motors won't go so far as to say its Oshawa, Ontario factory, which is losing the Chevrolet Camaro to the Lansing Grand River plant, is in trouble, analysts seem to think the factory's days are numbered. Forecasts for the facility are far from positive. The loss of the Camaro this year, combined with GM's targeted shutdown of a single-shift assembly line responsible for the fleet-only Chevy Impala Limited and the Equinox crossover is a bad enough omen. But with AutoForecast Solutions CEO Joe McCabe telling The Detroit News that the plant's other two products, the Cadillac XTS and Buick Regal, aren't likely to stick around beyond 2017, things look decidedly grim at Oshawa. "There is a fairly strong chance that the plant could close," Jeff Schuster, senior VP of forecasting for LMC Automotive, told The Detroit News. That doesn't mean that Unifor, Canada's auto union, and the Canadian government are going to let the factory die without a fight. And with the latter chipping in $10 billion as part of GM's 2009 bailout, you might think it has a degree of leverage in the situation. A meeting between the government and the Detroit Three at the 2015 North American International Auto Show revealed that Oshawa is already a topic of conversation. "We made it very clear that we would like to see an indication on the future of Oshawa sooner, in particular because the timing is very challenging for our supply chain to be able to adjust to potentially future orders or changes, but also to know that there are going to be future opportunities at Oshawa," Ontario's Minister of Economic, Development, Employment and Infrastructure Brad Duguid told The Detroit News. "Bottom line: It's time they made a longer-term commitment here," Unifor President Jerry Dias said, echoing Duguid's statements. It's unclear if this sort of strong talk will be enough to save 3,300-plus employees, although based on the analysts' forecasts, we doubt it.