2010 Chevrolet Equinox Lt on 2040-cars
7952 Veterans Memorial Pkwy, Saint Peters, Missouri, United States
Engine:2.4L I4 16V GDI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 2CNFLEEW9A6316139
Stock Num: 1918-1A
Make: Chevrolet
Model: Equinox LT
Year: 2010
Exterior Color: Black Granite Metallic
Interior Color: Jet Black
Options: Drive Type: AWD
Number of Doors: 4 Doors
Mileage: 47835
Not from the St. Louis? No problem, we can ship your purchase anywhere in the continental U.S. for FREE! Call today at 888-612-7311!
Chevrolet Equinox for Sale
- 2005 chevrolet equinox lt(US $5,500.00)
- 2006 chevrolet equinox lt(US $6,995.00)
- 2014 chevrolet equinox 1lt(US $28,875.00)
- 2014 chevrolet equinox 2lt(US $34,365.00)
- 2014 chevrolet equinox 1lt(US $27,710.00)
- 2014 chevrolet equinox ltz(US $35,310.00)
Auto Services in Missouri
West 60 Auto Parts Inc ★★★★★
Wes Jerde Performance Center ★★★★★
Waterloo Automotive ★★★★★
The Dent Devil of St Louis ★★★★★
Springfield Yamaha ★★★★★
Spectrum Glass Inc ★★★★★
Auto blog
Recharge Wrap-up: Range-extended EV taxis in London, 2016 Chevy Volt interior two years old
Fri, Feb 13 2015The first Metrocab range-extended EV taxis are operating on the streets of London. The cabs use a 12.2-kWh battery and two 50-kW motors, as well as a 1.0-liter gasoline range extender. Fuel economy is 98 MPGe on the ECE101 cycle, and total driving range is over 348 miles before needing to charge or refuel. Cabbies can expect to save GBP20 to GBP40 (about $30 to $60) per day on average. "The cash savings on fuel are significant, the ride and comfort outstanding, and my first customers are thrilled with the new cab," says the first operator of the new EV taxi, Preston Morris. "With its air suspension providing unrivaled comfort, panoramic glass roof for views of the city and silent powertrain, what's not to like?" Read more in the press release below. Chevrolet has had the interior design of the 2016 Volt finished for two years already, according to GM interior designer John McDougall. Beginning around 2010, GM received sketches from designers worldwide before narrowing it down to a handful of designs. Then the top three choices were molded from clay. The chosen theme was then refined for up to 18 months. "Every little thing you can imagine goes into that," says McDougall. "The glare angle from the windows, the placement of the controls, the placement of the seat. You have to create something that's beautiful and functional." Read more at GM Authority and at Inside EVs. More details have emerged about the Second Life Batteries Alliance. Vattenfall has announced a research project in partnership with BMW and Bosch to use retired EV batteries for stationary, grid-connected energy storage in Hamburg, Germany. Over 100 lithium-ion batteries from BMW i3 and ActiveE vehicles will make up a two-mWh storage unit for grid balancing, enough to power 30 four-person households for a week. The system is "compact enough to fit in a small building," says Bosch. Such storage systems are especially fit for storing and moving alternative forms of energy, which often fluctuate in supply more than electricity from a traditional power plant. Vattenhall will operate the storage unit for 10 years, with Bosch managing the batteries, during which time the three partners hope to learn more about battery applications and their performance over time. Read more at Green Car Congress, or in the press release below.
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.