Find or Sell Used Cars, Trucks, and SUVs in USA

4dr Sdn Auto 1lt New Sedan Automatic Gasoline 1.4l L4 Mpi Dohc 16v Turbo Tungste on 2040-cars

Year:2014 Mileage:0 Color: Tungsten Metallic
Location:

Jimmie Johnson's Kearny Mesa Chevrolet, 7978 Balboa Avenue, San Diego, CA 92111

Jimmie Johnson's Kearny Mesa Chevrolet, 7978 Balboa Avenue, San Diego, CA 92111
Advertising:

Chevrolet Cruze for Sale

Auto blog

GM says its electric pickup truck is 'in development'

Thu, Jun 6 2019

GM President Mark Reuss just reiterated the company's support for an electric pickup project. He also claimed that GM is going to be selling its future electric cars at "very average transaction prices" during the same conference with Wall Street analysts. Previously, Mary Barra informed the world of GM's electric pickup truck aspirations, but didn't tell us anything else. Reuss says the truck is already in development, though, according to a Wards Auto report. "We will have a complete electric lineup, including a pickup truck that's in development," Reuss said. This comment marks the second time GM has gone on the record about its intentions to bring an electric pickup to market. Additionally, Reuss said GM's third-generation global EV platform will be used to help develop the electric pickup. This platform was recently announced to underpin at least 20 new EVs from GM in the future — the platform itself is slated to be unveiled in 2021. Of course, this platform will be flexible and modular to allow various body styles to be used with it, a truck being one of those. Reuss still hasn't said what GM brand the pickup will be sold under, or what class of truck it will be. GM thinks this new platform is also going to be what helps it drive down the cost of building EVs. "We'll reach parity a lot sooner than people think," Reuss said comparing EVs to traditional gas-powered engines. "We're driving down the cost of batteries and the whole EV in general." As for electric pickups, Ford is also deep in development of its own electric F-150. However, neither of these truck projects have official timelines on them, so we can't say when they'll hit the market. For now, the cross-town rivals are both in development with their respective electric pickups. Even further across town is Rivian (in which Ford just invested half a billion dollars), a company that says its electric R1T pickup is right around the corner, with the official due date being end of 2020 for the time being. Green Chevrolet GMC Green Culture Green Driving Truck Electric Future Vehicles

2014 Chevrolet Silverado and GMC Sierra debut all-new designs, three new engines

Thu, 13 Dec 2012

General Motors has finally dropped the curtain on the 2014 Chevrolet Silverado and 2014 GMC Sierra. Both trucks have undergone substantial revisions with updated versions of the company's 4.3-liter V6, 5.3-liter V8 and 6.2-liter V8 engines. In a shot across the bows of both Ford and Chrysler, GM says it won't use a V6 engine adapted from passenger car applications. Instead, it developed the 4.3-liter engine based on its proven truck-duty architecture.
All three mills will boast direct injection fuel systems as well as a new cylinder head design. Combined with a revised piston, the new engines feature a smaller combustion chamber with a compression ratio of 11:1 or higher depending on the application. Cylinder deactivation and continuously variable valve timing are all part of the recipe, and each engine is paired with a six-speed automatic transmission with auto grade breaking. So far, no fuel economy or horsepower figures have been released, though GM says the new engines will best their predecessors in both areas.
Outside, the trucks feature a number of enhancements to reduce drag and wind noise, and GM claims both the Silverado and Sierra will offer buyers some of the quietest cabins in the class. Extended cab models now feature front-hinged rear doors to allow easier access to the back passenger area, and Crew Cab buyers can now select between a five-foot, eight-inch bed or a six-foot, six-inch bed. Buyers with a mind toward going off road will also rejoice in the return of the Z71 package, complete with Rancho shocks, front tow hooks and additional under-body protection.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.