Find or Sell Used Cars, Trucks, and SUVs in USA

2011 Carbon Zo6 Corvette Inferno Orange Rare Salvage Excelent on 2040-cars

US $60,999.00
Year:2011 Mileage:15000
Location:

Holbrook, New York, United States

Holbrook, New York, United States
Advertising:
Engine:LS7 Carbon Edition
Vehicle Title:Salvage
VIN: 1G1YL2DE7B5600007 Year: 2011
Make: Chevrolet
Drive Type: RWD
Model: Corvette
Mileage: 15,000
Trim: Two Door Coupe
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in New York

X-Treme Auto Glass ★★★★★

Automobile Parts & Supplies, Glass-Auto, Plate, Window, Etc, Windshield Repair
Address: 2561 Genesee St, Cheektowaga
Phone: (716) 542-1100

Wheelright Auto Sale ★★★★★

New Car Dealers, Used Car Dealers, Automobile Parts & Supplies
Address: 750 Montauk Hwy, Davis-Park
Phone: (631) 472-9100

Wheatley Hills Auto Service ★★★★★

Auto Repair & Service, Brake Repair, Tire Dealers
Address: 33 Kinkel St # 1, Westbury
Phone: (516) 333-6033

Village Automotive Center ★★★★★

Auto Repair & Service
Address: Wainscott
Phone: (631) 706-3720

Tim Voorhees Auto Repair ★★★★★

Auto Repair & Service, Brake Repair, Tire Changing Equipment
Address: 501 Day Hollow Rd, Owego
Phone: (607) 748-5351

Ted`s Body Shop ★★★★★

Automobile Body Repairing & Painting, Towing
Address: Mount-Upton
Phone: (607) 847-8574

Auto blog

UAW rejects GM contract proposal but makes a counter offer

Tue, Oct 1 2019

The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues.  Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare. 

Pony cars, trucks and Italian SUVs | Autoblog Podcast #552

Fri, Aug 31 2018

On this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Senior Editor Alex Kierstein and Associate Editor Reese Counts. We discuss the updated 2019 Chevy Camaro Turbo 1LE variant, the new 2019 GMC Sierra Denali, and the Ferrari-powered Maserati Levante GTS. We also debate whether Volkswagen should build the Atlas-based Tanoak pickup truck and what a delay means for the next-gen Ford Mustang. Finally, we answer a reader question about the state of Lexus.Autoblog Podcast #552 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown 2019 Chevy Camaro Turbo 1LE 2019 GMC Sierra 2019 Maserati Levante GTS Should Volkswagen build the Tanoak? Next-gen Ford Mustang delayed The past, present and future of Lexus Feedback Email – Podcast@Autoblog.com Review the show on iTunes Related Video: Podcasts Chevrolet Ford GM GMC Lexus Maserati RAM Truck Coupe SUV Luxury Performance

Chevy Bolt 200-mile EV going into production near Detroit

Thu, Feb 12 2015

Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.