2006 Chevy Colorado Crew Cab, 4x4, 220hp 3.5l, Very Clean Truck!! on 2040-cars
Easton, Pennsylvania, United States
Chevrolet Colorado for Sale
2008 chevrolet colorado lt pickup,auto,z85 pkg,only 71k miles,no reserve
2011 lt w/1lt used 2.9l i4 16v automatic rwd premium onstar(US $17,923.00)
Clean carfax alloy wheels mp3 decoder onstar fog lights chrome bumper tint
2wd reg cab work truck low miles 2 dr truck manual gasoline 2.9l dohc 4-cyl sfi(US $13,788.00)
2005 chevrolet colorado crew cab runs drives damaged salvage wrecked needs work(US $2,700.00)
2006 chevrolet colorado pickup truck(US $3,950.00)
Auto Services in Pennsylvania
Wyoming Valley Kia - New & Used Cars ★★★★★
Thomas Honda of Johnstown ★★★★★
Suder`s Automotive ★★★★★
Stehm`s Auto Repair ★★★★★
Stash Tire & Auto Service ★★★★★
Select Exhaust Inc ★★★★★
Auto blog
GM's Oshawa plant may close after Camaro production moves
Sat, Feb 7 2015Most of the time, when vehicle production is moved from one assembly plant to another, it spells bad news for the former. While General Motors won't go so far as to say its Oshawa, Ontario factory, which is losing the Chevrolet Camaro to the Lansing Grand River plant, is in trouble, analysts seem to think the factory's days are numbered. Forecasts for the facility are far from positive. The loss of the Camaro this year, combined with GM's targeted shutdown of a single-shift assembly line responsible for the fleet-only Chevy Impala Limited and the Equinox crossover is a bad enough omen. But with AutoForecast Solutions CEO Joe McCabe telling The Detroit News that the plant's other two products, the Cadillac XTS and Buick Regal, aren't likely to stick around beyond 2017, things look decidedly grim at Oshawa. "There is a fairly strong chance that the plant could close," Jeff Schuster, senior VP of forecasting for LMC Automotive, told The Detroit News. That doesn't mean that Unifor, Canada's auto union, and the Canadian government are going to let the factory die without a fight. And with the latter chipping in $10 billion as part of GM's 2009 bailout, you might think it has a degree of leverage in the situation. A meeting between the government and the Detroit Three at the 2015 North American International Auto Show revealed that Oshawa is already a topic of conversation. "We made it very clear that we would like to see an indication on the future of Oshawa sooner, in particular because the timing is very challenging for our supply chain to be able to adjust to potentially future orders or changes, but also to know that there are going to be future opportunities at Oshawa," Ontario's Minister of Economic, Development, Employment and Infrastructure Brad Duguid told The Detroit News. "Bottom line: It's time they made a longer-term commitment here," Unifor President Jerry Dias said, echoing Duguid's statements. It's unclear if this sort of strong talk will be enough to save 3,300-plus employees, although based on the analysts' forecasts, we doubt it.
GM execs fired over fraudulent India emissions testing
Mon, 29 Jul 2013General Motors hadn't had a recall in India since 1995. That changed when it was discovered that certain employees were playing tricks with local emissions testing in order to ensure passing grades for engines. More than ten GM Powertrain employees in India and the US have been let go over the ensuing emissions flap, including Sam Winegarden, VP of global engine engineering, a man who has been with the company since 1969, leading development of some marquee powerplants.
According to Automotive News, an internal investigation revealed that employees "violated testing procedures," sometimes swapping specially prepared low-emissions engines during testing regimes for the Chevrolet Tavera SUV equipped with the 2.0-liter and 2.5-liter engines. Employees were also manipulating weights in order to get vehicles placed into different emissions categories. The discovery has led to GM recall the 114,000 Taveras produced over an eight-year period and halting their production and sale.
The Economic Times of India reports that the issue is due to "a faulty component." GM has developed a solution to the issue, and once it is validated in testing and approved by the Indian authorities, the recalled vehicles will be fixed at dealers and production will resume.
GM cutting Chevy Sonic, Buick Verano production [UPDATE]
Sun, Jan 25 2015UPDATE: A previous version of this story indicated that Orion Assembly would be idled for seven weeks, from February 16 through April 6. This was incorrect. The factory will instead only be idled for the weeks of February 16 and April 6. The story has been edited to reflect this. General Motors has announced that the factory responsible for the Buick Verano and Chevrolet Sonic will be idled for the weeks of February 16 and April 6, with blame being placed on excess supply. The Orion Assembly plant, about 45 minutes north of GM's Renaissance Center headquarters, employs about 1,800 people, but they'll be given a pair of furloughs as inventories of the sub-compact Sonic and premium compact Verano reach 127 days and 84 days, respectively. That works out to 26,600 Chevys and 9,800 Buicks waiting for buyers. According to Automotive News, the compact Chevy sales bested the industry average in 2014, jumping up nine percent versus the the overall segment's eight-percent gain, while the Buick sedan's sales were down four percent. When asked about the shutdown, a GM spokesman told AN that it will "build to market demand," while also pointing out that the company did not comment on production plans. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM buick encore orion assembly