Cheap Chevy Cavalier on 2040-cars
Gleason, Tennessee, United States
O.K. Here it is: Up for auction is my beloved 1996 Cavalier that I bought off ebay March 2012. I bought the car with 160000 miles on it and it now has 216300. It never gave me problem one. It has a sony remote stereo in it, and I also have Dodge Stratus rims on it, I think they look cool. This is a Chicago car so it has rust. It also recently developed a coolant leak, I put a new thermostat and new radiator cap on it. After, going thru the bleeding of the coolant system (PAIN) it is still leaking from somewhere around the right front tire, and overheats when you turn the heat on??? Since, I was recently hired by the USPS, I do not have the time to fool with it, so I bought a different car and want to sell this one. It would make a great grocery getter, cheap first car, parts car, or for someone who would like to fix it and resale it. The car runs and drives. As far as I can tell the head gasket is not blown, the oil is fine, and no white smoke from tail pipe. I will drive it a few more days, so the mileage might change. I also just changed the oil 1 week ago, I have kept the oil changed every 3000 miles with High Mileage Oil (Penzoil, or Vavoline) I will put more pics up tommorow.
Happy Bidding
|
Chevrolet Cavalier for Sale
2001 chevrolet cavalier(US $1,700.00)
2005 chevrolet cavalier 2.2l
2001 chevrolet cavalier base sedan 4-door 2.2l
Very good condition, 1 owner(US $1,485.00)
1994 chevy cavalier--just under 76,000 miles--good, reliable transportation!(US $1,200.00)
2005 chevrolet cavalier ls coupe sport great cond sunroof chrome rims no reserve
Auto Services in Tennessee
White Bluff Car Care Inc ★★★★★
Veach`s Auto Repair ★★★★★
Tune Up & Exhaust Shop ★★★★★
Triple B Automotive ★★★★★
TLC Automotive ★★★★★
Tennessee Clutch & Supply Inc ★★★★★
Auto blog
GM delays 3.0-liter Duramax diesel in Silverado and Sierra pickups
Thu, May 23 2019Stricter testing protocols around the world are making it harder for automakers to predict launch timelines. GM is the latest to get caught in emissions nettles, the Detroit carmaker forced to delay the launch of its new Duramax 3.0-liter inline-six diesel for the Chevrolet Silverado 1500 and GMC Sierra 1500. That's what company reps told dealers in a memo seen by Automotive News this week. Dealers and buyers had been promised the Flint, Mich.-built oil-burner in early 2019, but AN wrote that the EPA certification hiccup has turned into a "slight delay." A GM spokesman told Motor1, "[We] did not attribute [the delay] to a single entity, as the truth is this is a collaborative effort between GM and several government entities. We will make the 2020MY Duramax available for dealers orders soon, and expect to deliver the first trucks to customers soon after emissions testing is complete." We know the new 3.0-liter Duramax diesel has 277 horsepower and 460 pound-feet of torque, outdoing Ford's 3.0-liter PowerStroke diesel by 27 hp and 20 lb-ft. But without final EPA paperwork, GM can't release the numbers that will show how the two engines stack up when considering fuel economy and tow ratings. The certification process has been sticky for a few other makers of late, especially since the Volkswagen Group situation in 2015. BMW had to delay the launch of four diesel models in 2016 over EPA testing. The new Ram 1500 dribbled out in a trickle last year for reasons thought to deal with EPA testing, coming as it did a year after the EPA investigated Ram's EcoDiesel engines in 2017 and 2018. More recently, WLTP testing in Europe caught out just about every automaker over there. Since we're almost halfway through 2019, the delay until the 2020 model year is only a few months. Still, GM told dealers to cancel any orders for the engine for this model year. Dealers will need to resubmit the orders once opening begins, but GM hasn't said when production will begin other than "soon." The company said that it will offer 2020-model-year replacement vehicles to customers and dealers. If prices hold into the next model year, the 2020 Silverado 1500 and Sierra 1500 with the inline-six diesel will come at a $3,890 premium over the 2.7-liter turbo four-cylinder, and a $2,495 premium over the 5.3-liter V8.
Chevy Bolt 200-mile EV going into production near Detroit
Thu, Feb 12 2015Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.
GM pickup truck plant in Flint to add 1,000 assembly workers
Tue, Feb 5 2019FLINT, Mich. — General Motors said Tuesday it will add 1,000 workers to build new heavy-duty pickup trucks at its plant in Flint, Michigan, and will give priority to GM workers who were laid off elsewhere. The announcement comes the day after GM said it was starting to hand pink slips to about 4,000 salaried workers in the latest round of a restructuring announced in late November that will ultimately shrink its white-collar workforce in North America by 15 percent out of 54,000. GM has come under fire from U.S. President Donald Trump and Midwestern lawmakers for its plans to stop production at five North American factories and cut up to 15,000 jobs in all. The automaker has said it is trying to find new jobs for 1,500 U.S. hourly workers at the affected plants. Flint's truck plant could be a haven for many of these employees. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday will celebrate the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. Elsewhere in the company on Monday, two people briefed on the cuts in the white-collar salaried workforce said GM is cutting hundreds of jobs at its information technology centers in Texas, Georgia, Arizona and Michigan and more than 1,000 jobs at its Warren, Michigan Tech Center. GM is filing new required mass layoff notices with state agencies and disclosed the cuts to lawmakers. The largest U.S. automaker announced in November it would cut a total of about 15,000 jobs and end production at five North American plants. The cuts include eliminating about 8,000 salaried workers, or about 15 percent. GM cut about 1,500 contract workers in December and said 2,300 salaried workers accepted buyouts, officials said. "These actions are necessary to secure the future of the company, including preserving thousands of jobs in the U.S. and globally. We are taking action now while the overall economy and job market are strong, increasing the ability of impacted employees to continue to advance in their careers, should they choose to do so," GM spokesman Pat Morrissey said, adding the bulk of the cuts should be completed in the next two weeks. Morrissey said GM would provide salaried workers with severance packages and job placement services.