2001 Chevrolet Chevy Cavalier , Sunfire, 2.2, 5 Speed, Ac, No Reserve on 2040-cars
Westwego, Louisiana, United States
Body Type:Coupe
Engine:2.2l inline 4
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Number of Cylinders: 4
Make: Chevrolet
Model: Cavalier
Trim: base coupe
Warranty: Vehicle does NOT have an existing warranty
Drive Type: fwd
Options: CD Player
Mileage: 185,227
Power Options: Air Conditioning
Exterior Color: White
Interior Color: Tan
Chevrolet Cavalier for Sale
Auto Services in Louisiana
Winners Circle Car Care Center ★★★★★
Twin Tire ★★★★★
Top 10 Motorsports ★★★★★
Service Plus Auto Glass ★★★★★
Quintin`s Paint And Body Shop ★★★★★
Pupie`s Auto Repair ★★★★★
Auto blog
GM investing $167m in Spring Hill for new midsize vehicles
Tue, 06 Aug 2013General Motors has announced a large investment in its Spring Hill, Tennessee facility. The former home of Saturn production will be getting a $167 million addition to a previously announced $183 million, to cover a pair of new midsize vehicles. The investment is expected to create 1,800 jobs at the factory.
That $350 million is being divvied up for a pair of programs at Spring Hill. The first will take the bulk of the money ($223 million) and create 1,000 of the 1,800 jobs, while the other will take the remaining $127 million and generate the leftover 800 positions. But GM says the investment will cover "midsize vehicle programs." So what could they be?
The leading candidate in our minds is a new crossover for Buick, called the Anthem, that will slot between the Encore and Enclave, but will be slightly smaller than the Equinox and Terrain. As we've explained, the new model will likely be the first product to sport GM's new D2UX platform, which will eventually replace both the Delta and Theta platforms. Spring Hill is already building the Equinox, so there could be some credence to this theory.
GM to trim Russian output, raise prices amid currency woes
Thu, Feb 5 2015General Motors is shutting down its factory in Russia's second largest city, St. Petersburg, from the middle of March until the middle of May as the country's currency, the ruble, continues to give economists fits. The ruble's value has plunged due not only to western sanctions, but a precipitous fall in oil prices. We knew these factors were already impacting the auto industry there, as Ford reported in its 2014 earnings statement, and now they're forcing GM to cut production at the factory, shown above, that is responsible for production of the Chevrolet Cruze and Opel Astra. Meanwhile, Automotive News is citing Russian outlet Kommersant as saying that GM has hiked its prices in the country by an average of 20 percent over the past two months. While a GM spokesman confirmed the St. Petersburg plant would be shut down for the two-month span reported by Kommersant and AN, he would not confirm the price increase. News Source: Automotive News - sub. req.Image Credit: Alexander Nikolayev / AFP / Getty Images Earnings/Financials Plants/Manufacturing Chevrolet GM Opel opel astra
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.