1984 Chevrolet Caprice Classic Sedan 4-door 5.0l on 2040-cars
Dixon, Illinois, United States
Body Type:Sedan
Engine:5.0L 305Cu. In. V8 GAS OHV Naturally Aspirated
Vehicle Title:Clear
Fuel Type:GAS
For Sale By:Private Seller
Used
Year: 1984
Interior Color: Burgundy
Make: Chevrolet
Number of Cylinders: 8
Model: Caprice
Trim: Classic Sedan 4-Door
Drive Type: RWD
Options: CD Player
Mileage: 98,712
Exterior Color: Black
1984 Chevy Caprice with 98xxx original miles. Has brand new 24 irocs and tires with lift. Tires are 295/35 so they are a bit bigger. Has new duals with the older camaro square tips. 305 V8 runs great recent tune up starts up everytime. Interior is all original except for the sound system. 2 12" kickers and additional speakers. Speedometer isn't the correct mph due to the wheels. Exterior is original so it has some wear obviously being 30 years old. Car has never seen winter. Needs rear bumper fillers which are like $50 on ebay. Air conditioner blows but not cold. Clean title. I think thats about it call or text for any additional information (815) 718-9574
|
Chevrolet Caprice for Sale
2013 chevrolet captiva sport 2ls(US $19,993.00)
2014 chevrolet captiva sport 2ls(US $19,000.00)
2013 chevrolet captiva sport 2ls(US $18,000.00)
2014 chevrolet captiva sport ltz(US $23,795.00)
2014 chevrolet captiva sport lt(US $21,000.00)
2014 chevrolet captiva sport lt(US $21,900.00)
Auto Services in Illinois
Xtreme City Motorsports ★★★★★
Westchester Automotive Repair Inc ★★★★★
Warson Auto Plaza ★★★★★
Voegtle`s Auto Service Inc ★★★★★
Thom`s Four Wheel & Auto Svc ★★★★★
Thomas Toyota ★★★★★
Auto blog
Next Chevy Volt will be 2016 model and ride on new chassis
Fri, Mar 7 2014What do we know about the 2016 Chevy Volt? Well, for now, all we can do is try to put the puzzle together without the box. Thankfully, a new batch of pieces has arrived from a new report in Edmunds, which says that the 2016 model year will introduce the second generation of a car that hasn't been dramatically updated since it went on sale in 2010. The new Volt is getting an "evolutionary styling change" and will ride on a new front-drive platform that has been developed by General Motors. GM's Kevin Kelly told AutoblogGreen that he has "no comment on future products," but he did acknowledge that Chevrolet is working on a second-generation Volt, "but I can't say anything about timing." Everybody already knew that a next-gen Volt is coming, so that's not a surprise. What we don't know is any real concrete information on the car itself. The few tidbits of information we do have help define the outlines of the next version of Chevy's halo car, but they're not confirmed yet. For the record, they range from the eye-raising (a $10,000 price drop) to the logical (20 percent more electric range). We can't see the whole picture yet, but the pieces do point to the 2016 Volt, which would be released next year sometime, being a much bigger deal than the last update, when the Volt's range was increased by three electric miles thanks to a battery capacity increase of 16 kWh to 16.5.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
2040Cars.com © 2012-2025. All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.
Use of this Web site constitutes acceptance of the 2040Cars User Agreement and Privacy Policy.
0.044 s, 7879 u