1987 Chevrolet Camaro Iroc Z,convertible,red Leather,5speed,black,anniversary on 2040-cars
Naperville, Illinois, United States
Engine:305 TPI
Body Type:Convertible
Vehicle Title:Clear
Exterior Color: Black
Make: Chevrolet
Interior Color: Red
Model: Camaro
Number of Cylinders: 8
Trim: IROC Z
Drive Type: RWD
Warranty: Vehicle does NOT have an existing warranty
Mileage: 13,900
Sub Model: IROC Z
* FIRST YEAR OF CONVERTIBLE SINCE 1969,ONLY 744 CONVERTIBLE'S PRODUCED IN 87'
Chevrolet Camaro for Sale
- 2012 chevrolet camaro lt convertible coupe black leather great time buy save big(US $33,777.00)
- 2002 chevy camaro ss
- 2012 chevrolet camaro ss with rs package. for sale by original one owner(US $32,500.00)
- 1987 chevy z-28 camaro(US $10,000.00)
- !999 camaro ss low miles
- 1991 camaro rs convertible teal auto 5.0 v8 new haartz canvas top - no reserve!
Auto Services in Illinois
Wolf and Cermak Auto ★★★★★
Wheels Of Chicagoland ★★★★★
Urban Tanks Custom Vehicle Out ★★★★★
Towing Solutions ★★★★★
Top Coverage Ltd ★★★★★
Supreme Automotive & Trans ★★★★★
Auto blog
Chevy Volt replacement battery cost varies wildly, up to $34,000
Fri, Jan 10 2014There's a growing hubbub in the plug-in vehicle community over what looks like some ridiculously cheap replacement batteries for the Chevrolet Volt going up for sale. GM Parts Online, for example, is selling a replacement Volt battery with an MSRP of $2,994.64 but, with an online discount, the price comes down to $2,305.88. For the 16-kWh pack in the 2012 Volt, that comes to a very low $144.11 per kilowatt hour (kWH). But is it a real deal? How can it be, when a Chevy dealer may quote you a price of up to $34,000 to replace the pack? For a 16-kWh Volt pack, $2,305.88 comes to a very low $144.11 per kWh. But is it a real deal? Battery packs in alternative propulsion vehicles are usually priced by the kWh and, historically, they've been thought to be in the range of $500-per-kWh for OEM offerings. Since automakers are understandably secretive about their costs, we still don't know what the real number is today, but we do know it varies by automaker. Tesla, for example, has said it pays less than $200-per-kWH at the cell level but, of course, a constructed pack would be more. Whatever is going on, li-ion battery prices are trending downward. So, $144.11 certainly sounds great, but what's the story here? Kevin Kelly, manager of electrification technology communications for General Motors, reminded AutoblogGreen that GM Parts Online is not the official GM parts website and that, "the costs indicated on the site are not what we would charge our dealers or owners for a replacement battery. There would be no cost to the Volt owner if their battery needs replacement or repair while the battery is under the eight year/100,000 mile limited warranty coverage provided by Chevrolet." A single price tag also can't be accurate for everyone, Kelly said. "If the customer needs to have their battery repaired beyond the warranty, the cost to them would vary depending on what needs to be replaced or repaired (i.e. number of modules, which specific internal components need replacement, etc.)." he said. "So, it's hard for us to tell you exactly what the cost would be to the customer because it varies depending on what might need to be repaired/replaced. As a result, the core charge would vary." But, is the $2,300 price even accurate for anyone? Thanks to a reader comment, we see that this similar item on New GM Parts makes it look like the lithium-ion modules that Kelly mentioned – where a lot of the expensive bits are – are not included.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM, UAW poaching Nissan workers in Tennessee
Tue, Sep 8 2015General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.