Find or Sell Used Cars, Trucks, and SUVs in USA

1969 Chevrolet Camaro Rs Z28 on 2040-cars

US $37,099.00
Year:1969 Mileage:3060 Color: Green /
 Gray
Location:

Pennsville, New Jersey, United States

Pennsville, New Jersey, United States

This 69 Camaro is finished in its original Fathom Green paint with white rally stripes which is flawless.

The original DZ 302 engine is long gone, but it is currently powered by a solid-roller 414/693hp small-block Chevy
engine with 620 ft/lbs of torque and an Auto Gear 4-speed manual transmission with McLeod dual-disc clutch.

The rear is a Moser 9’’ Ford with 4.11 gears. West Upper and Lower control arms and Calvert traction bars help
put the power down to the pavement.

To helped stop the car are 13’’ Baer disc brakes in the front and Wilwood discs in the rear.

The interior was restored to mostly stock except for gauges (installed in the glovebox) and a pair of Corbeau
racing seats.

The tires are 255/45ZR17 Goodyear Eagle F1’s on Budnik Custom Wheels. The tires have low miles with plenty of
tread.

This REAL Z/28 RS Camaro has the original Protect-O-Plate and original paperwork from GM of Canada. Also, the car
includes a binder with receipts from the restoration and paperwork/dyno sheets of the engine. Budnik custom wheels

Just over 3,000 miles on this build.

This is an amazing vehicle with well over $100,000 in restoration receipts!

The build quality is truly second to none.

Auto Services in New Jersey

Woodbridge Transmissions ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: Woodbridge
Phone: (732) 726-0900

Werbany Tire And Auto Repair ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Inspection Stations & Services
Address: 1337 N Black Horse Pike, Audubon
Phone: (856) 227-0049

Vonkattengell Transmission Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 61 Main St, Keyport
Phone: (732) 542-0015

True Racks Ltd ★★★★★

Automobile Parts & Supplies, Van & Truck Accessories, Van & Truck Conversions
Address: 330 Jacksonville Rd, Edgewater-Park
Phone: (866) 595-6470

Top Dude Tint ★★★★★

Auto Repair & Service, Window Tinting, Car Wash
Address: 59 Mount Vernon Ave, Alpine
Phone: (914) 663-6620

TM & T Tire ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Tire Dealers
Address: 4115 Northern Blvd, Hoboken
Phone: (718) 729-3500

Auto blog

Recharge Wrap-up: BYD unveils 60-ft electric bus, Honda sticking with hybrids in Europe

Thu, Oct 16 2014

BYD has debuted a 60-foot electric bus at the American Public Transportation Association Expo in Houston, TX. The Lancaster bus, as it is called, has a 120-passenger capacity and can drive over 170 miles on a single charge. The articulated bus features low floors and no steps, thanks to in-wheel hub motors. BYD also displayed a 40-foot electric bus that drove the 1,500 miles to the show under its own power (recharging along the way, of course). Read more in the press release below. Honda says it will continue to sell hybrids in Europe, despite the fact that it has stopped selling the CR-Z and Insight due to slow sales. "Our focus at the moment is on our 1.6-liter diesel but we haven't forgotten about hybrid technology," says Honda Europe's Philip Ross. Honda will sell the next-generation Fit (badged as the Jazz) in Europe when it launches next summer, and will sell the next-gen hybrid version beginning in 2016. Honda sold 4,500 of the Jazz hybrid in Europe last year. Read more at Automotive News. XL Hybrids is selling its XL3 Hybrid Electric Drive System in California. The news comes after the California Air Resources Board issued an executive order allowing the aftermarket hybrid conversion for 2012-2014 Chevrolet Express and GMC Savana vans. The XL3 Hybrid regenerative braking conversion increases real-world mpg by about 25 percent. Read more in the press release below. NRG eVgo has finished installing 60 charging stations at the Sony Pictures Entertainment studio lot and offices in Culver City, California. The Level 2 chargers, which will be managed by NRG eVgo, allow employees to charge their EVs during the workday. An average of 90 EVs and PHEVs park at the studio headquarters every day, thanks in part to Sony Pictures' Alternative Vehicles Incentive program for its employees. Learn more in the press release below. Pennsylvania's Public Utility Commission will allow operators of EV charging stations to set prices based on kilowatt hour usage. This change ensures that drivers pay for the actual energy they use, rather than the time they spend charging, since different cars can charge at different speeds. Car Charging Group has already begun using the per-kWh fee structure at its charging stations throughout the state. Other states that allow kWh pricing are California, Colorado, Florida, Hawaii, Illinois, Maryland, Minnesota, New York, Oregon, Virginia and Washington. Read more in the press release below.

GM recalling nearly 4,000 vehicles over airbag concerns

Thu, 31 Jan 2013

Four different General Motors vehicles from the 2012 model year are being recalled over a potential airbag issue. The driver's side airbag shorting bar in the 2012 Buick Verano and 2012 Chevrolet Camaro, Cruze and Sonic might make contact with the airbag terminals, even during a crash. If so, the airbag won't deploy when it should, possibly increasing injury to the driver.
The recall is expected to begin on February 13 for the 3,896 units that might be affected. GM will notify owners who can then take their vehicles to dealers to have the airbag coil replaced. A bulletin from the National Highway Traffic Safety Administration below has more info.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.