*no Reserve* 1997 Chevrolet Custom 1 Ton Dually 4x4 Limo Escalade Low Miles 51k! on 2040-cars
Phoenix, Arizona, United States
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Body Type:Pickup Truck
Warranty: Vehicle does NOT have an existing warranty
Make: Chevrolet
Model: C/K Pickup 3500
Options: Leather
Mileage: 51,829
Sub Model: DUALLY
Exterior Color: White
Doors: 4 doors
Interior Color: Tan
Cab Type: Crew Cab
Number of Cylinders: 8
Engine Description: 7.4L V8 SFI
Drivetrain: 4-Wheel Drive
Chevrolet C/K Pickup 3500 for Sale
4x4 c3000 4 speed 396 motor with 10,000 miles on it
1988 gmc chevy 3500 dana 60 14 bolt one ton crew cab 4x4 454 nv4500 np205 hummer
1994 chevrolet pickup utility body
1995 gmc chevy 3500 4x4 flatbed gooseneck 23k original 9ft. western snow plow
Chevy c3500 c/k lifted 454 truck super swampers 1 ton dually silverado towing
1995 chevy 3500 truck(US $7,000.00)
Auto Services in Arizona
Yates Buick Pontiac GMC ★★★★★
Valley Express Auto Repair ★★★★★
Unlimited Brakes & Auto Repair ★★★★★
The Tin Shed Auto ★★★★★
Son`s Automotive Svc ★★★★★
San Martin Tire Shop ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
The USPS needs 180,000 new delivery vehicles, automakers gearing up to bid
Wed, Feb 18 2015Winning the New York City Taxi of Tomorrow tender was a huge prize for Nissan, even though the company is still working through the process of claiming its prize. The United States Postal Service has begun the process to take bids for a new delivery vehicle to replace the all-too-familiar Grumman Long Life Vehicle, and that will be a much larger plum for the automaker who wins it, perhaps worth more than six billion dollars. The Grumman LLV is an aluminum body covering a Chevrolet S-10 pickup chassis and General Motors' Iron Duke four-cylinder engine. The USPS bought them from 1987 to 1994, and the 163,000 of them still in service are a monumental drain on postal resources: they get roughly ten miles to the gallon instead of the quoted 16 mpg, drink up more than $530 million in fuel each year, and their constant repair needs like the balky sliding door and leaky windshields have led the service to increase the annual maintenance budget from $100 million to $500 million. A seat belt is about as modern as it gets for safety technology, and the USPS says that assuming things stay the same, it can't afford to run them beyond 2017. Last year it put out two triage requests for proposals seeking 10,000 new chassis and drivetrains for the Grumman and 10,000 new vehicles. The LLV is also too small for the modern mail system in which package delivery is growing and letter delivery is declining. The service says it doesn't have a fixed idea of the ideal "next-generation delivery vehicles," but it listed a number of requirements in its initial request and is open to any proposal. Carriers have some suggestions, though, saying they want better cupholders, sun visors that they can stuff letters behind, a driver's compartment free of slits that can swallow mail, and a backup camera. The request for information sent to automakers pegs the tender at 180,000 vehicles that would cost between $25,000 and $35,000 apiece, and it will hold a conference on February 18 to answer questions about the contract. GM is the only domestic maker to avow an interest, while Ford and Fiat-Chrysler have remained cagey. Yet with a possible $6.3 billion up for grabs and some new vans for sale that would be advertised on every block in the country, we have a feeling everyone will be listening closely come February 18. We also have a feeling the LeMons series is going to be flooded with Grummans come 2017. News Source: Wall Street Journal, Automotive News - sub.
Here are 12 electric pickups in the works
Wed, Oct 21 2020With the unveiling of the GMC Hummer EV, the list of planned electric pickups is expanding. Legacy automakers like Ford and Chevy have theirs coming, as do startups like Tesla, Rivian and Bollinger, as well as some lesser known brands. Here are all the electric pickup trucks we know to be in the works, along with a few that are being discussed or mulled over. GMC Hummer EV The 2022 GMC HUMMER EV is a first-of-its kind supertruck develop View 40 Photos We’ve seen it now, and itÂ’s the business. The GMC Hummer EV comes out swinging with 1,000 horsepower from GMÂ’s new Ultium electric powertrain program, a wealth of off-road features, a removable roof, Super Cruise and the revival of the Hummer name. WeÂ’ll see the first ones on the road next fall. Tesla Cybertruck Tesla Cybertruck at the Petersen Museum View 14 Photos Tesla revealed the Cybertruck last year with, ahem, unique styling, a number of powertrain options and a claimed range of up to 500 miles. It has a compressed paper dash, a ramp for the bed, and “shatterproof” windows. It has already racked up hundreds of thousands of reservations. It will be built in Texas. Rivian R1T 2021 Rivian R1T View 15 Photos EV startup Rivian revealed its R1T electric pickup toward the end of 2018 with a claimed 0-60 time of 3 seconds and a towing capability of 11,000 pounds. Preproduction began in September 2020 at RivianÂ’s factory in Normal, Illinois. Bollinger Motors B2 Bollinger Motors B2 side outdoors View 31 Photos BollingerÂ’s B2 electric pickup is a Class 3 off-roader with retro styling, removable roof panels, and a unique “frunkgate” with a pass-through down the center of the vehicle. It was created with both enthusiasts and workers in mind, with features that can get it to remote places (portal axles, hydro-pneumatic suspension) and to get things done (room for 40 2x4s, equipped with eight 110-volt outlets and one 220-volt outlet). Bollinger also plans to make the B2 Chassis Cab available for fleet customization. Ford F-150 Electric Electric Ford F-150 Towing View 9 Photos WeÂ’ve known this to be in the works since early 2019. Since then, details have trickled out. Back in June, Ford announced its F-150 Electric would be coming within two years. WeÂ’ve seen it pull a million pounds worth of train and trucks, heard it will have more power than any other F-150, and seen its LED-laden front end.