1990 Ss 454 Chevy C1500 Street Truck Custom 2wd on 2040-cars
Abingdon, Maryland, United States
Body Type:Pickup Truck
Engine:468 CI BBC
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Model: C/K Pickup 1500
Year: 1990
Cab Type (For Trucks Only): Regular Cab
Trim: SS 454
Warranty: Vehicle does NOT have an existing warranty
Drive Type: RWD
Options: CD Player
Mileage: 175,000
Power Options: Power Locks, Power Windows
Exterior Color: Black
Interior Color: Red
Number of Cylinders: 8
Disability Equipped: No
Chevrolet C/K Pickup 1500 for Sale
- 1996 chevy c/k1500 z71 extended cab, diesel(turbo), 4wd
- 1987 chevy 4x4 step side k20 4 speed(US $4,500.00)
- 97 chevy ext cab 2wd runs good!!!!!(US $4,000.00)
- Very clean 1985 swb pickup(US $5,000.00)
- 1995 chevrolet k1500 silverado standard cab pickup 2-door 5.7l
- 1987 built monster chevy 4x4 k10 / v10(US $10,000.00)
Auto Services in Maryland
Vision Autographics ★★★★★
Virginia Tire & Auto of Cascades ★★★★★
The Mobile Mechanic ★★★★★
Standard Auto Parts ★★★★★
Spiering`s Garage Inc ★★★★★
Self Service Auto Repair ★★★★★
Auto blog
GM to squeeze out more production capacity for midsize trucks
Tue, May 26 2015General Motors was predicting a strong showing for the Chevrolet Colorado and GMC Canyon before they debuted, and demand among dealers for the midsize trucks even exceeded company's expectations. The positive situation has left GM with a problem, though: finding ways to increase capacity for the pickups at the Wentzville Assembly plant in Missiouri. With a third shift already running, GM has continued to look for ways to build just a few more of the trucks at the plant. The company has plans to hire as many as 1,000 more workers for the Saturday and Sunday shifts to construct an additional 2,000 pickups a month, according to unnamed insiders at the factory speaking to Automotive News. The little adjustments even extend to getting rid of an unpaid break to add 18 minute of assembly time over the course of a day, which equals about 3,500 more vehicles a year. All of this effort comes because the trucks are in such high demand. According to GM's figures, the company has delivered a combined 35,720 units of the Colorado and Canyon from January through April 2015, and the Chevy was the fastest-selling truck in the US for the previous three months. In May, it spent an average of just 12 days in showrooms before being snapped up. And even better for the company, 43 percent of these buyers came from other brands. According to Automotive News, the most popular trade-ins have included the Ford F-150, Toyota Tacoma, and Dodge Dakota. Related Video:
GM laying off more than 4,000 workers Monday morning
Sat, Feb 2 2019According to reports from Automotive News, The Detroit News, and CNN, General Motors plans to begin laying off more than 4,000 salaried workers starting Monday morning. In a statement to AN, a spokesperson for the automaker said, "We are not confirming timing. Our employees are our priority. We will communicate with them first." We've been expecting layoffs at General Motors since November, 2018. At the time, the Detroit-based automaker announced it would seek to shed 8,100 salaried employees, shut down five assembly plants in North America, and kill off several slow-selling models. One month earlier, GM offered buyout packages to 18,000 workers and said it would seek to cut its global workforce by 25 percent. A spokesperson said at the time the moves were "proactive steps to get ahead of the curve by accelerating our efforts to address overall business performance." The cost-cutting moves are expected to save GM up to $2.5 billion in 2019 and as much as $6 billion by 2020. David Kudla, CEO and chief investment strategist of Mainstay Capital Management, referred to the impending culling as "Black Monday" and told The Detroit News that the layoffs would begin around 7:30 a.m. and continue in waves throughout the coming days and weeks. GM plans to deliver on its fourth-quarter and full-year 2018 earnings report on Wednesday. President Donald Trump plans to deliver the annual State of the Union address a day earlier on Tuesday. We expect to hear plenty more from both sides over the next several days.
Our favorite mid-engine Corvette theories and rumors
Tue, Sep 13 2016The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.