1979 Chevrolet C 10 Pick-up Truck on 2040-cars
Greenwood, South Carolina, United States
This 1979 Chevrolet Truck had one owner before I got it. It has been well maintained and to 35 years old. It also a rebuilt 400 small block engine bored .40 over with a Holley carburetor. The motor has right at about 70,000 miles on it with a three speed manual transmission. Has a 373 rear end. Dual chrome exhaust. Custom bucket seats and wood trimmed interior. Brand new Tiger Paw tires with aluminum wheels. Has a minor rust spots but nearly showroom ready. This is a GREAT TRUCK!!! Must see to believe!! Call or Txt 864-401-7959 |
Chevrolet C-10 for Sale
- 1967 stepside, new 350, 350 turbo trans, recent restoration(US $21,000.00)
- 1968 chevy c-10 short bed pickup | classic show truck(US $29,600.00)
- 1972 chevrolet k20 truck
- 1965 c10 custom cab pick up v8 truck hot rat rod chopper bobber hauler 66 64 63
- 1965 chevrolet c10 swb fleetside pickup truck project-runs, drives, stops(US $5,900.00)
- 1966 chevy truck s10 five speed hot rod rat rod
Auto Services in South Carolina
Winn`s Collision Center ★★★★★
Watson Imports ★★★★★
Vintage Auto ★★★★★
Twin Lakes Auto Body & RV Repair ★★★★★
Tire Kingdom ★★★★★
Tim`s Body Shop ★★★★★
Auto blog
Former Fisker CEO has some advice for Tesla Motors
Wed, Oct 22 2014Former Fisker Automotive CEO and ex-Chevrolet Volt vehicle-line director Tony Posawatz has some words of caution for Tesla Motors. The long-time automaker executive questions the California automaker's long-term viability – and gives some praise – in a talk with Benzinga, which you can listen to below. While the all-wheel-drive D that Tesla unveiled earlier this month in Southern California wowed a packed crowd, Posawatz (starting at around minute 4:45 in the interview) says Tesla would've been better off taking the resources it expended toward that Model S upgrade and directed them towards speeding up the development of a more affordable plug-in. Perhaps a number of investors agreed, since the company's stock fell the day after the D was announced. Posawatz says Tesla has been over-reliant on the sale of ZEV credits. Posawatz also says that Tesla has been over-reliant on the sale of zero-emissions vehicle credits in California for its earnings and questions whether the automaker will ever work at a large enough scale to sufficiently drive down costs and make consistent profits. Tesla CEO Elon Musk would take issue with this characterization. Posawatz first made his mark in the plug-in vehicle world when he was the vehicle-line director at General Motors for the Volt extended-range plug-in from 2006 to 2012. Later that year, he joined extended-range plug-in maker Fisker Automotive as its CEO, though quit that job during the summer of 2013 as the company was descending into insolvency. He joined the Electrification Coalition this past March. News Source: Benzinga Green Chevrolet Fisker Tesla Electric PHEV Tony Posawatz
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
Plug In 2014: VIA makes the case for 'free' plug-in hybrid work vans, trucks
Fri, Aug 1 2014If you're a fleet manager who's been waiting anxiously for the chance to buy a plug-in hybrid van from Via Motors, your wait is almost over. If you work for the right fleet, anyway. David West, the chief marketing efficer for VIA Motors, took AutoblogGreen for a ride around the San Jose Convention Center in a Via van sporting an Electric Blue paint job as part of the Plug In 2014 Conference this week and gave us an update on how things are coming along. The big news is that the Via PHEV van production is going to start by the end of September. Via can currently build two vans an hour at its production plant in Mexico, or about 16 a day and could easily double that. "That would get us to 20,000 a year with two full lines running," West said. "We have the capacity." "There is no way gas can compete with electric." – David West, Via Motors But they can't sell that many quite yet. By the end of December, around 350 Vans will be made, mostly for a $20-million program from the Department of Energy (DOE) and the South Coast Air Quality Management District that will see the vehicles used by fleets that will report energy data to the Idaho National Lab. Via is also finishing up CARB certification for both the van and the company's plug-in hybrid pick-up truck. About 50 percent of Via's technology in the truck will not need to be tested again, since it's the same as what's in the van, but things like crash tests will need to be done twice. Despite the progress, this is not where Via hoped it would be today. The bankruptcy of battery supplier A123, "took about a year off our timeline," West said. "It's been getting a little slow getting it to market, there have been some challenges, particuarly since we had the country's worst recession right in the middle of this wrap up, but it's inevitable in my mind. There is no way gas can compete with electric." Maybe that's why FedEx has expressed an interest in buying around 5,000 units, West said. FedEx already has some pilot vehicles, just like Verizon does, and PG&E wants to replace all of their gas trucks with electric vehicles, which would be another 3,000 sales, he said. Besides the fuel savings, vehicles like these, with easy on-site power generation, could also work wonders in post-disaster situations, he said, since they could replace the need for generators.