Chevy Blazer 2 Door Subn Work Vehical. High Miles. Runs Good on 2040-cars
Verplanck, New York, United States
Body Type:SUV
Vehicle Title:Clear
Engine:6 Cyl
Fuel Type:Gasoline
For Sale By:Private Seller
Number of Cylinders: 6
Make: Chevrolet
Model: Blazer
Trim: SUBN
Options: Cassette Player, 4-Wheel Drive
Drive Type: 4WD
Power Options: Air Conditioning, Power Locks, Power Windows
Mileage: 250,000
Exterior Color: Tan
Interior Color: Brown
Disability Equipped: No
Work vehicle. Good running condition. Many new parts. Needs some work. Slight rust on door bottoms. Dent on rear bumper. Great buy!
Chevrolet Blazer for Sale
1985 chevrolet blazer k5 silverado - good original - no reserve
1976 chevrolet k5 blazer/4x4/gmc/ base sport utility 2-door 5.7l(US $3,100.00)
Chevy blazer 4x4 only 61k miles new tires, runs great
1986 gmc jimmy c1500/k1500 custom sport utility 2-door 5.7l
1996 blazer xtreme clone 2-door 4.3l
1982 chevrolet blazer (full size) 6.2 diesel
Auto Services in New York
Vogel`s Collision ★★★★★
Vinnies Truck & Auto Service ★★★★★
Triangle Auto Repair ★★★★★
Transmission Giant Inc ★★★★★
Town Line Auto ★★★★★
Tony`s Service Center ★★★★★
Auto blog
More Corvette Stingray Factoids: Vanishing panel gaps and 26-mpg LT1
Thu, 28 Feb 2013During January's Detroit Auto Show, we managed a longer than expected wandering tag-team interview with C7 Corvette chief engineering exec Tadge Juechter (pictured above), and LT1 engine boss Jordan Lee (pictured below). They are, quite honestly, two of the very nicest bigshot lads to ever walk the engineering corridors of an American manufacturer. Both are enthralled by what they're doing for a day job. So are we.
We've followed the pre-sale anticipation for the Chevrolet C7 Corvette Stingray like an Oreck vacuum yanking every speck of dirt from a well-trampled carpet. Everything is reportable and contains a grain of further knowledge about this dramatically important and cheered-for car, as it continues to be pressured into representing all that is superior about the American dream. The Corvette wears one heavy cloak.
So, most of what was talked about has been expertly reported already right here on Autoblog. But, looking through our notes again, both Jeuchter and Lee added facts to the buzzing mix.
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
GM says its electric pickup truck is 'in development'
Thu, Jun 6 2019GM President Mark Reuss just reiterated the company's support for an electric pickup project. He also claimed that GM is going to be selling its future electric cars at "very average transaction prices" during the same conference with Wall Street analysts. Previously, Mary Barra informed the world of GM's electric pickup truck aspirations, but didn't tell us anything else. Reuss says the truck is already in development, though, according to a Wards Auto report. "We will have a complete electric lineup, including a pickup truck that's in development," Reuss said. This comment marks the second time GM has gone on the record about its intentions to bring an electric pickup to market. Additionally, Reuss said GM's third-generation global EV platform will be used to help develop the electric pickup. This platform was recently announced to underpin at least 20 new EVs from GM in the future — the platform itself is slated to be unveiled in 2021. Of course, this platform will be flexible and modular to allow various body styles to be used with it, a truck being one of those. Reuss still hasn't said what GM brand the pickup will be sold under, or what class of truck it will be. GM thinks this new platform is also going to be what helps it drive down the cost of building EVs. "We'll reach parity a lot sooner than people think," Reuss said comparing EVs to traditional gas-powered engines. "We're driving down the cost of batteries and the whole EV in general." As for electric pickups, Ford is also deep in development of its own electric F-150. However, neither of these truck projects have official timelines on them, so we can't say when they'll hit the market. For now, the cross-town rivals are both in development with their respective electric pickups. Even further across town is Rivian (in which Ford just invested half a billion dollars), a company that says its electric R1T pickup is right around the corner, with the official due date being end of 2020 for the time being. Green Chevrolet GMC Green Culture Green Driving Truck Electric Future Vehicles