1957 Chevrolet Sedan *** Loaded With Options *** Beautiful .. Florida Car on 2040-cars
Clearwater, Florida, United States
Body Type:Sedan
Engine:350 V-8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Number of Cylinders: 8
Make: Chevrolet
Model: Bel Air/150/210
Trim: Bel Air
Warranty: Vehicle does NOT have an existing warranty
Drive Type: Rear Wheel Drive
Options: Cassette Player
Mileage: 99,069
Power Options: Air Conditioning, Power Windows, Power Seats
Exterior Color: Turquoise
Interior Color: Turquoise
Chevrolet Bel Air/150/210 for Sale
- 1956 chevrolet 2 door post.hot rod black big wheels solid new motor/trans
- 1957 chevrolet bel air orig. docs. 350 c.i./th 350
- 1962 chevy bel air pb air ride leather seats custom interior very nice
- Frame off restoration 1955 chevy chevrolet 2 door post ls1 pro touring - cherry(US $55,000.00)
- 1955 chevrolet w/ original 265 v8 engine and drivetrain
- 1968 chevrolet bel air-rare 307 v-8-5600 original miles-untouched 1 owner family(US $15,000.00)
Auto Services in Florida
Zip Automotive ★★★★★
X-Lent Auto Body, Inc. ★★★★★
Wilde Jaguar of Sarasota ★★★★★
Wheeler Power Products ★★★★★
Westland Motors R C P Inc ★★★★★
West Coast Collision Center ★★★★★
Auto blog
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Recharge Wrap-up: Chevy Volt CarPlay video, Tesla Supercharger importance
Fri, Feb 5 2016A video demonstrates Apple CarPlay on the touch display in the next-generation Chevrolet Volt. The Volt's eight-inch (bigger than an iPad Mini) capacitive display is capable of putting Siri and your iPhone apps and right at your fingertips. It's "the best CarPlay display I've seen," says the user in the video. In case you're not in the market for a new Volt, 9to5Mac offers some of its favorite aftermarket CarPlay screens. See the video above, and read more at 9to5Mac. A single Supercharger can make a big difference in the life of a Tesla owner. Teslarati's Electric Jen talks about purchasing a Model S, being assured by both Tesla employees and the map of planned Supercharger sites that one would be built along an important route for her. With the construction being pushed back, it made visiting family tricky. "As if owning such a grand car isn't embarrassing enough, asking for a ride to drop off and pick up said car because you can't make it home without charging really made me feel awkward," she says. "You see, one single charging location can mean the world to some people," Jen adds. Read the whole article at Teslarati. Tesla once had considered creating mobile range extender trailers for the Model S. Elon Musk touched upon the abandoned idea during his visit to Paris. While Tesla ultimately dismissed the concept, Nomadic Power has taken the opportunity to hitch their product onto the Tesla brand. "We are delighted, that Tesla Motors' CEO Elon Musk is thinking about a concept like ours for even more extending the range of the Tesla models," says Nomadic Power's CEO Manfred Baumgaertner. He adds, "This confirms our approach to build a long distance mobility provider for all electric vehicles on the market." If you say so, Baumgaertner. Read more from International Business Times, and in the press release below. Renault is giving its EV batteries a second life through Connected Energy's E-STOR. When the batteries have degraded to the point that they're no longer suitable for use on the road, they still have a significant capacity that can be used for other purposes. Still useful for stationary storage, they can be used to support charging sites in order to allow for faster charging. The stationary batteries can charge slowly at the site, but then offer up the juice in a hurry when it's needed for a vehicle. Read more from Renault.
Supercharged 2015 Chevy Corvette Z06 takes the C7 beyond the ZR1
Mon, 13 Jan 2014
The Z06 is just about everything we got in the last ZR1, but better.
After a bright-yellow false start, here is the real thing: the fourth-generation, 2015 Corvette Z06. If Chevrolet makes a ZR1 version of the C7 Corvette, it's going to be absolutely mega, because the Z06 is just about everything we got in the last ZR1, but better.