1956 Chevrolet 210 4 Dr Wagon on 2040-cars
Canoga Park, California, United States
This is a California 1956 Chevrolet 210 Wagon for sale by Original Owner. This car is in Showroom condition and has never been in a accident. This car runs Excellent and has less than 17,000 Miles on engine and a newly built 700R4 Transmission. Front Disc Brakes. Air Conditioning , AM/FM Stereo with Ipod capability.
|
Chevrolet Bel Air/150/210 for Sale
- 1955 chevrolet bel air/150/210 sedan delivery classic
- 1957 chevy 2 door hardtop sports coupe
- 55 chevy 2 dr hdtp(US $13,500.00)
- 1957 chevy belair w/454 and 400 turbo transmission(US $22,500.00)
- 1962 chevrolet bel air- 409 dual quad(US $35,000.00)
- 1957 chevrolet bel air base 2-door coupe 350 ci v-8 engine
Auto Services in California
ZD Autobody ★★★★★
Z Benz Company Inc ★★★★★
Www.Bumperking.Net ★★★★★
Working Class Auto ★★★★★
Whittier Collision Center #2 ★★★★★
West Tow & Roadside Servce ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
Weekly Recap: Lamborghini to build SUV
Sat, May 30 2015Finally, Lamborghini will build a sport utility vehicle. The Italian supercar maker confirmed this week that it will launch a luxury SUV in 2018. It will be built at Lamborghini's soon-to-expand factory in Sant'Agata Bolognese in Italy, and will double the company's current sales volume. Lamborghini did not announce a name for the vehicle or other details, but noted a concept version, the Urus, was displayed at the Beijing motor show in 2012. It will be sold around the world, but it's expected to be a critical offering in the United States, China, and the Middle East. The automaker projects the SUV will sell about 3,000 units per year, and it will be the third product in Lamborghini's portfolio. It currently sells the Huracan and Aventador supercars. "The introduction of a third model line endorses the stable and sustainable growth of the company and signifies for us the beginning of a new era," Lamborghini chief executive Stephan Winkelmann said in a statement. The project is also a boon for Italy, which will get 500 new jobs in the Emilia Romagna region as Lamborghini's factory will nearly double in size. Ian Fletcher, principal analyst for IHS Automotive, said the SUV will position Lamborghini for future growth. "It could well also bring new customers to the brand [who] may find the dramatic styling of Lamborghini products appealing, but find its typical sports cars restrictive," he said. "If it is a success, the SUV could be a catalyst to Lamborghini broadening its portfolio further." OTHER NEWS & NOTES GM invests in Chevy Camaro factory General Motors is investing $175 million to upgrade its factory in Lansing, MI, to build the 2016 Chevy Camaro. The investment will pay for new tooling and equipment. The improvements include three new paint systems and two new robotic framers. GM will add a second shift at the factory to build the Camaro, resulting in 500 jobs. The automaker had dropped the plant to one shift last year amid slow sales for its products, the Cadillac ATS and CTS. GM is spending $5.4 billion over the next three years to upgrade its US facilities. Last week, GM announced plans to spend $439 million to build a new paint shop for the Chevy Corvette. While the Camaro and Corvette plant improvements are intriguing to enthusiasts, GM also confirmed this week that it is investing $1.2 billion in its Fort Wayne (IN) factory that builds trucks.
GM recalling 426,000 sedans over faulty transmission shift cable
Fri, 21 Sep 2012General Motors is recalling some 426,240 sedans that may have a faulty transmission shift cable, according to a National Highway Traffic Safety Administration report this morning. The recall concerns a fault within four-speed automatic transmissions equipped on 2007-2010 Saturn Aura models, and 2008-2010 Chevrolet Malibu and Pontiac G6 models.
The report specifies that tabs on the transmission shift cable may fracture and separate. Such a fault could cause a discrepancy between the actual position of the transmission and the apparent position of the shift lever.
GM is currently working to notify owners of the vehicles in question, and dealers will check and replace shift cables free of charge. Scroll down to read the complete NHTSA report.