Find or Sell Used Cars, Trucks, and SUVs in USA

2000 Cadillac Seville Sts Sedan 4-door 4.6l on 2040-cars

US $1,000.00
Year:2000 Mileage:153000
Location:

Augusta, Georgia, United States

Augusta, Georgia, United States

 GOOD MOTOR AND INTERIOR ONE SMALL DENT BEHIND DRIVER SIDE REAR FENDER. TRANSMISSION NEEDS TO BE REBUILT OR REPLACED

Auto Services in Georgia

ZBest Cars ★★★★★

New Car Dealers, Used Car Dealers, New Truck Dealers
Address: 3280 Commerce Ave, Avondale-Estates
Phone: (888) 862-8501

Youmans Chevrolet Co ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 2020 Riverside Dr, Elko
Phone: (478) 746-2020

Wren`s Body Shop ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Wheels-Aligning & Balancing
Address: 6402 Fairburn Rd, Douglasville
Phone: (770) 942-5642

Wholesale Tire & Wheel Co ★★★★★

Auto Repair & Service, Tire Dealers
Address: 620 General Courtney Hodges Blvd, Perry
Phone: (478) 987-4794

Walton Tire Co ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 290 Lee Byrd Rd, Winder
Phone: (770) 466-4447

TJ Custom Muffler & Brake ★★★★★

Auto Repair & Service, Mufflers & Exhaust Systems, Brake Repair
Address: 3998 Center Hill Church Rd, Monroe
Phone: (770) 554-4496

Auto blog

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.

Cadillac SRX production moving to TN, next-gen Equinox going to Mexico

Fri, 29 Aug 2014

It's a good week for the town of Spring Hill, TN, as General Motors has announced that its factory in the city of 31,000 will receive a $185 million contract to produce engines. On top of that, the next-generation Cadillac SRX crossover will be built at the factory (NA models are presently built in Ramos, Arizpe Mexico), which was once famous for being the home of GM's now-defunct Saturn brand.
The factory is one of GM's six facilities around the globe that will screw together the company's new line of three- and four-cylinder Ecotec engines. Spring Hill currently builds the 2.0-liter, turbocharged Ecotec, as well as the naturally aspirated 2.4 and 2.5-liter variants.
Spring Hill's vehicle assembly lines were idled in 2009, but were reactivated in 2011. The SRX is just one of the products meant to benefit from last year's $350-million investment, and should have a positive impact, creating or retaining around 1,800 positions at the factory.

Submit your questions for Autoblog Podcast #325 LIVE!

Mon, 18 Mar 2013

We're set to record Autoblog Podcast #325 tonight, and you can drop us your questions and comments via our Q&A module below. Subscribe to the Autoblog Podcast in iTunes if you haven't already done so, and if you want to take it all in live, tune in to our UStream (audio only) channel at 10:00 PM Eastern tonight.
Discussion Topics for Autoblog Podcast Episode #325
Twin-turbo Cadillac CTS coming