Find or Sell Used Cars, Trucks, and SUVs in USA

1982 Cadillac Seville Carriage Top on 2040-cars

US $3,950.00
Year:1982 Mileage:106732
Location:

Las Vegas, Nevada, United States

Las Vegas, Nevada, United States

hi and welcome to my add on my ..1982 Cadillac Seville carriage top

its all original & very well taken care of has 106,732 miles on it

its a California car since new...no rust any where  body is straight I give it a 9-out of 10

paint is original .as well ...interior is in very good condition.

also...I give that an 8-out of 10 

the carriage top is in very good condition as well the top is about 2 years old

this car runs excellent ...its a 4100 V8..engine this car runs smooth no check engine light on

transmission shifts smooth also  so has the original stereo every thing works in it

dash board has a minor crack ...tail lights fillers has some cracks...ALSO HAVE THE ORIGINAL WINDOW STICKER

for more info call 702-716-2029....$3.950.or best offer

a $500.none refundable deposit due in 24hr...remaining balance due in 72 hours...

I don't do paypal ..so don't ask for paypal ..bank to bank transfer only thank you

Auto Services in Nevada

Vinny`s Automotive ★★★★★

Auto Repair & Service
Address: 1575 Glendale Ave, Sun-Valley
Phone: (775) 358-5255

Upholstery Works ★★★★★

Automobile Parts & Supplies, Automobile Seat Covers, Tops & Upholstery, Furniture Designers & Custom Builders
Address: 3111 S Valley View Blvd Ste V105, Blue-Diamond
Phone: (702) 889-9824

Tire Xpress ★★★★★

Auto Repair & Service, Tire Dealers, Wheels-Aligning & Balancing
Address: 4002 W Charleston Blvd, Blue-Diamond
Phone: (702) 625-7103

Tire Works Total Car Care ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 660 S Highway 160, Pahrump
Phone: (775) 751-6100

Tahoe City Chevron Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: HIGHWAY 89 & Highway 28, Gardnerville
Phone: (530) 448-8860

Sterling Auto Sales ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 6101 Boulder Hwy, N-Las-Vegas
Phone: (702) 821-6304

Auto blog

Cadillac SRX production moving to TN, next-gen Equinox going to Mexico

Fri, 29 Aug 2014

It's a good week for the town of Spring Hill, TN, as General Motors has announced that its factory in the city of 31,000 will receive a $185 million contract to produce engines. On top of that, the next-generation Cadillac SRX crossover will be built at the factory (NA models are presently built in Ramos, Arizpe Mexico), which was once famous for being the home of GM's now-defunct Saturn brand.
The factory is one of GM's six facilities around the globe that will screw together the company's new line of three- and four-cylinder Ecotec engines. Spring Hill currently builds the 2.0-liter, turbocharged Ecotec, as well as the naturally aspirated 2.4 and 2.5-liter variants.
Spring Hill's vehicle assembly lines were idled in 2009, but were reactivated in 2011. The SRX is just one of the products meant to benefit from last year's $350-million investment, and should have a positive impact, creating or retaining around 1,800 positions at the factory.

Electric Cadillac Lyriq, Chevy Bolt EUV and more GM electric cars are on the way

Wed, Mar 4 2020

GM’s murky and somewhat secretive electric car plan is falling into place, as the company dumped a massive amount of information about whatÂ’s in the pipeline at an event at its Warren, Michigan campus today. New EVs are going to be popping up across the GM brand lineup, with new entries from Chevrolet, Cadillac, GMC and Buick in progress. We also learned some big news about GMÂ’s new Ultium battery tech today, but check out this story for all of those nitty-gritty details. The electric vehicle onslaught will begin with the Cadillac Lyriq, an electric SUV thatÂ’s already been teased out. Naming it the Lyriq is the news today. No explanation for the name was provided, so weÂ’ll have to wait for April to learn more. GM didnÂ’t specifically say if the Lyriq would be launched at the NY Auto Show, but that show (assuming coronavirus doesnÂ’t cancel it) will begin on April 8 this year. Next up in the order of events is the GMC Hummer electric truck that we know will be launching on May 20. This truck will use GMÂ’s modular Ultium battery technology. However, the wait to buy a GMC Hummer will be a long one, as the truck isnÂ’t going to dive into production until fall 2021 at GMÂ’s Detroit-Hamtramck plant. GM revealed that its new modular Ultium batteries can be configured anywhere from a 50 kWh pack to a 200 kWh pack depending on the application. Range is estimated to be about 400 miles on the upper end with the largest battery pack, and GM continues to boast about a 0-60 mph acceleration time of three seconds. Charging estimates for the Ultium battery-equipped Hummer EV were also provided. GM says its truck platform will have 800-volt battery packs and be capable of 350 kW fast-charging. Time estimates werenÂ’t given, but those numbers suggest the truck will be a rapid charger. The Hummer truck on hand, which was the same that previously starred in GMC's Super Bowl spot, showed off removable roof panels that store in the frunk, as well as what appeared to be a version of GMC's Multi-Pro tailgate. It also featured sail panels on the sides, similar to those in front of the bed of the Chevy Avalanche. In addition to the Hummer, expect to see a couple Chevys launching. GM says the refreshed Bolt EV will be launched “in late 2020” with a refreshed interior and what appear to be thicker front seats.

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle