We Finance! 20768 Miles 2011 Cadillac Sts 3.6l V6 24v Onstar Bose on 2040-cars
Grand Prairie, Texas, United States
Cadillac STS for Sale
2007 cadillac sts base sedan 4-door 4.6l(US $8,000.00)
2005 cadillac sts base sedan 4-door 3.6l
We finance 06 sts4 v6 awd clean carfax heated leather seats chromes cd changer(US $9,000.00)
2009 cadillac sts v8 luxury htd leather sunroof nav 29k texas direct auto(US $22,980.00)
2008 cadillac sts v8! nav gm warr htd-sts xenon rear-pdc bose/6cd moonroof 69k!
2005 cadillac sts base sedan 4-door 4.6l black with tan leather(US $8,250.00)
Auto Services in Texas
XL Parts ★★★★★
XL Parts ★★★★★
Wyatt`s Towing ★★★★★
vehiclebrakework ★★★★★
V G Motors ★★★★★
Twin City Honda-Nissan ★★★★★
Auto blog
Cadillac developing stretched ATS-L just for China
Sat, 25 Jan 2014To luxury automakers, long-wheelbase sedans are to China that crossovers and SUVs are to the US, so it isn't all that surprising any more when the latest sedan gets an extra couple of inches between the wheels to improve rear-seat comfort. According to Car News China, the next sedan to get the stretch will be the Cadillac ATS, which will increase the wheelbase by 10 centimeters (about four inches) to become the ATS-L.
Designed to go up against rivals like the BMW 335Li and the added-length Mercedes C-Class, the ATS-L will reportedly be built locally in China with an engine list that will grow as well. Currently, only the 2.0-liter turbo engine is offered in the ATS in China, but the ATS-L will get the full spectrum of ATS engines including the base 2.5-liter and the peppier 3.6-liter V6. This isn't the first time Cadillac has offered a China-specific stretched sedan either as the SLS dates back to 2006.
2014 Cadillac ELR
Mon, 29 Sep 2014Well, this is awkward.
A few years ago, Audi Of America's boss Johan de Nysschen went on record describing the Chevrolet Volt as "a car for idiots." Fast-forward to earlier this summer, and the well-regarded executive suddenly found himself in a new office with new business cards bearing the title: President, Cadillac. That means that among other challenges, de Nysschen is now tasked with selling the ELR, a car that is, at its core, a Volt in a sportier, less utile frock wearing a price tag that's twice as expensive.
Frankly, it's not a prospect we imagine the South African executive and recent Infiniti boss relishes. Just about nobody is buying the ELR - Cadillac has sold but 774 examples of its plug-in hybrid coupe this year and it presently has an almost a 200-day supply according to Automotive News. What's more, those numbers actually represent big improvements over just a few months ago, before GM started heaping on the incentives. The cynic in us says that the bad news for De Nysschen is that he's got a borderline sales-proof car in his new corporate garage. The good news? Cadillac customers apparently aren't idiots.
GM lays off 450 at Lansing Grand River Assembly
Mon, Dec 8 2014General Motors will lay off 450 employees at its Lansing Grand River factory, The Detroit News reports, which is 100 more than the company said it'd be letting go last month. Lansing Grand River Assembly currently builds the Cadillac ATS and CTS, both of which have suffered sluggish sales, with the smaller sedan down 20 percent through last month and the larger model down 2.3 percent, The Detroit News reports. "We are adjusting plant production capacity to better align with market demand. Beginning in January 2015, the plant will operate on a single shift," a GM statement read, before explaining that not all the laid off Grand River employees will be jobless. Of the employees that have been laid off to make room for the single work shift, around 200 will transfer to the Lansing Delta Township factory, home of the Lambda-platform crossovers, GM's statement confirmed. The News expects this one-shift arrangement to continue until at least late next year, when the Alpha-platform Chevy Camaro transitions from General Motors' Oshawa, Ontario factory to Lansing. Cadillac President Johan de Nysschen said at last month's LA Auto Show, "It may not necessarily be permanent, a time may come when we've gained momentum and we can reinstate it. But for now, the adjustment to production capacity is in alignment with our plans for 2015."