Find or Sell Used Cars, Trucks, and SUVs in USA

2005 Cadillac Sts White Diamond Florida Driven 76k Leather Bose Remote Start on 2040-cars

US $11,970.00
Year:2005 Mileage:76979 Color: White /
 Tan
Location:

Fort Myers, Florida, United States

Fort Myers, Florida, United States
Advertising:
For Sale By:Dealer
Engine:6
Transmission:Automatic
Body Type:Sedan
Vehicle Title:Clear
Fuel Type:Gas
Condition:

Used

VIN (Vehicle Identification Number)
: 1G6DW677X50210220
Year: 2005
Make: Cadillac
Disability Equipped: No
Model: STS
Doors: 4
Drivetrain: Rear Wheel Drive
Mileage: 76,979
Trim: Base Sedan 4-Door
Exterior Color: White
Drive Type: RWD
Interior Color: Tan
Number of Cylinders: 6

Auto Services in Florida

Workman Service Center ★★★★★

Auto Repair & Service
Address: 2947 Gulf Breeze Pkwy, Gulf-Breeze
Phone: (850) 932-3239

Wolf Towing Corp. ★★★★★

Auto Repair & Service, Towing, Transportation Services
Address: Sun-City-Center
Phone: (813) 928-9389

Wilcox & Son Automotive, LLC ★★★★★

Auto Repair & Service
Address: 62 W. Illiana Street Suite C, Windermere
Phone: (407) 440-2848

Wheaton`s Service Center ★★★★★

Auto Repair & Service, Towing, Tire Dealers
Address: Grassy-Key
Phone: (305) 451-3500

Used Car Super Market ★★★★★

Auto Repair & Service, Used Car Dealers, Wholesale Used Car Dealers
Address: 3120 W Tennessee St, Ochlockonee-Bay
Phone: (850) 575-6702

USA Auto Glass ★★★★★

Automobile Parts & Supplies, Automobile Accessories, Windshield Repair
Address: 30000 S Dixie Hwy, Sunny-Isles-Beach
Phone: (305) 247-9100

Auto blog

Cadillac dealers frustrated over Escalade production snarls

Wed, 20 Aug 2014

Lincoln went through it during the launch of the MKZ last year, Jeep went through something similar with its Cherokee launch, and now the 2015 Cadillac Escalade has apparently caught the bug: dealer delivery delays because of quality control checks. Automotive News reports that Cadillac dealers have been waiting three times longer than usual - a month or more - from the time an Escalade leaves the assembly line to when it gets delivered. Worse, dealers are saying they don't always know where their vehicles are in transit, or when they are set to arrive. The situation has upset customers who have put down deposits and things have gotten so bad that some dealers have reportedly stopped taking pre-orders.
Cadillac says it has the delay, called "dwell time," down to two weeks, and it expects to cut that to a week by the beginning of September. The company said "a lengthy quality-assurance process on some interior parts" has caused the lag, the report citing additional issues with figuring out which vehicles should be delivered first. A spokesman said that more trucks have been put in the distribution system to work through the backlog, but it's clear it's still going to take some time to set things right, with one dealer telling AN that cars ordered in February and March still haven't arrived.
Brand chief Kurt McNeil said additional personnel are at the Escalade's Arlington, Texas factory to speed up the checks, and spreadsheets tracking every order have been distributed to field staff. Even with the snafu, though, the Escalade is Cadillac's best seller through July.

2015 Cadillac Escalade

Mon, 07 Apr 2014

Cadillac has been an interesting story in the auto industry over the past several years. Its comeback bid may be well over a decade old, but it's only recently that the Wreath and Crest has transformed from the auto industry's retirement home into its hot new thing. Today's Cadillac is a powerful marque working to instill passionate design, sound driving dynamics and cutting-edge technology into each model it builds, with vehicles like the ATS and redesigned CTS leading the charge.
Now, its latest model has arrived. This fourth-generation Escalade is among the most important new Cadillacs since the division's renaissance kicked into high gear. It's the brand's de facto flagship, and the first vehicle many young people think of when hearing the name "Cadillac." In the past, the Escalade was the chosen vehicle of the rich, flashy and famous. It's suffered over the past few years, though, particularly as new and more luxurious competitors have come to the fore.
With this latest redesign, General Motors is aiming to retake the spotlight as purveyors of the market's premier luxury SUV. To find out if it's been successful, I ventured down to the South Carolina Lowcountry to test the all-new 2015 Escalade.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.