Find or Sell Used Cars, Trucks, and SUVs in USA

2012 Srx Luxury Heated Seats Panoramic Roof Bose 1-owner Call 888-696-0646 on 2040-cars

Year:2012 Mileage:36046
Location:

Dallas, Texas, United States

Dallas, Texas, United States
Advertising:

Auto Services in Texas

XL Parts ★★★★★

Automobile Parts & Supplies, Automobile Accessories
Address: 2416 N Frazier St, Cut-And-Shoot
Phone: (936) 441-3500

XL Parts ★★★★★

Automobile Parts & Supplies, Automobile Parts, Supplies & Accessories-Wholesale & Manufacturers, Used & Rebuilt Auto Parts
Address: 6450 Midway Rd, Blue-Mound
Phone: (817) 924-0099

Wyatt`s Towing ★★★★★

Auto Repair & Service, Towing, Locks & Locksmiths
Address: 1210 N US Highway 69, Flint
Phone: (903) 569-6060

vehiclebrakework ★★★★★

Auto Repair & Service, Brake Repair
Address: Aldine
Phone: (956) 251-3140

V G Motors ★★★★★

Auto Repair & Service, Automotive Tune Up Service, Automobile Air Conditioning Equipment-Service & Repair
Address: 10710 W Bellfort St, Houston
Phone: (281) 498-0909

Twin City Honda-Nissan ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 10549 Memorial Blvd, Monroe-City
Phone: (409) 981-1220

Auto blog

2014 Cadillac CTS Vsport [w/video]

Mon, 16 Sep 2013

Bridging The Gap With Power And Poise
As you read these words, West Coast Editor Michael Harley is preparing to drive the brand-new 2014 Cadillac CTS along the gorgeous, sun-drenched roads of Southern California. And while I'll wait for Harley's full report before I put words in his mouth, I'm willing to bet he enjoys the hell out of Cadillac's new CTS. In fact, I'm sure of it.
I say this with confidence because, about a month ago, I spent the better part of a day flogging the new CTS Vsport around the 2.9-mile Milford Road Course - a challenging circuit laid out in the infield of an oval test track at GM's proving grounds in southeast Michigan. The MRC was built about a decade ago after Bob Lutz was lured out of retirement to work closely with GM's product development team, and thus, this circuit is known informally as the "Lutz Ring." The main objective of the MRC was to have an in-house facility for engineers to fine-tune vehicle dynamics, without having to constantly schlep cars over to Germany's infamous Nürburgring. (Of course, they still do.)

First Cadillac ELR rolls off the line

Thu, 30 May 2013

Gearing up for the Belle Isle Grand Prix this weekend, General Motors invited some of the Chevrolet and Cadillac racecar drivers out to its Detroit-Hamtramck assembly plant. While there, the racers - including IndyCar Driver and Chevrolet Volt owner, Simona De Silvestro - witnessed the very first 2014 Cadillac ELR to roll off the assembly line.
These vehicles are not destined for customers, however, but instead pre-production units will be used by engineers for testing purposes. Actual production of ELR consumer models is expected to commence closer to the end of this year. As a refresher, this range-extended electric Cadillac shares much of its powertrain with the Volt but will have a sportier coupe design inspired by the Converj Concept. De Silvestro manged to snap a few images of here own, which you can see in the gallery below.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.