Find or Sell Used Cars, Trucks, and SUVs in USA

1976 Cadillac Fleetwood Brougham D'elegance Sedan 4-door 8.2l on 2040-cars

US $5,000.00
Year:1976 Mileage:110000
Location:

Hackensack, New Jersey, United States

Hackensack, New Jersey, United States

Used 1976 Cadillac, under restoration. Engine runs strong. Motor and transmission is in good running order, but needs restoration. As shown in the posted photos, the car does need restoration. Some work was started but not completed.

Asking $5000.00 or best offer. Only serious buyers, please, contact via e-Bay.

Buyer is responsible for all shipping charges and arrangements.

 

Auto Services in New Jersey

XO Autobody ★★★★★

Automobile Body Repairing & Painting
Address: 2906 W 12th St, Fort-Hancock
Phone: (718) 338-4600

Wizard Auto Repairs Inc ★★★★★

Auto Repair & Service
Address: 819 66th St, Kenilworth
Phone: (718) 745-7370

Trilenium Auto Recyclers ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Used & Rebuilt Auto Parts
Address: 464 US Highway 202 #B, Hampton
Phone: (866) 595-6470

Towne Kia ★★★★★

New Car Dealers
Address: 3101 State Route 10, Liberty-Corner
Phone: (866) 595-6470

Total Eclipse Master of Auto Detailing, Inc. ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Accessories
Address: 113 Jefferson Ave, Newark
Phone: (718) 668-2345

Tony`s Garage ★★★★★

Auto Repair & Service
Address: 200 N Main St, Pennsauken
Phone: (215) 646-1027

Auto blog

2013 Cadillac XTS [w/video]

Wed, 30 Jan 2013

The Cadillac Of Stopgaps
As confusing as most alphanumeric car names have gotten in recent years, at least one constant has been that the letter "X" is generally indicative of a crossover. Then why did General Motors use this letter on its new 2013 Cadillac XTS luxury sedan? Well, for that, we'll have to look to the world of mathematics where "X" stands for an unknown variable or a placeholder. Now we're talking. The XTS is just an interim product sitting at the top of Cadillac's four-door food chain until the brand gets a true flagship in place. That sounds like a lot of resources to spend on what will likely be a one-and-done model, but the automaker needed to get something - anything - to replace the DTS.
So here you have the 2013 XTS. A big luxury sedan that was created to bridge the gap between Cadillac's recent past and its pending future. Going into our week with this XTS knowing that it was a stopgap measure proved to be both a blessing and a curse. On one hand, we know (or hope) that this car will act as a baseline for future high-end Cadillac models, but at the same time, we couldn't help but be mindful of past stopgap models, albeit in more entry-level segments, like the Cimarron and Catera.

2015 Cadillac Escalade

Fri, 29 Aug 2014

I have never liked traveling to Monterey, CA. The picturesque coastal city is about 300 miles from my home in Los Angeles, which means cramped and uncomfortable regional aircraft are part of the equation when the turnaround is only one night. Over the years, I have cursed the LA Basin's bumper-to-bumper traffic en route to the airport, argued with TSA personnel over carry-on baggage and waited countless hours for the fog to lift just for the anguish of being packed into a small regional jet for the flight. Of course, the process repeats on the trip home with equal misery.
Yet this time I am not suffering.
Cadillac has dropped its all-new 2015 Escalade in my driveway. Instead of battling city congestion, attempting to reason with misinformed government agents, snacking on a too-small bag of pretzels and physically rubbing shoulders with a dubious stranger for 90-plus minutes within the confines of a bumpy aircraft, I have chosen to forgo air travel and drive myself door-to-door in a fullsize luxury sport utility vehicle.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.