Find or Sell Used Cars, Trucks, and SUVs in USA

70 Cadillac Eldorado on 2040-cars

US $3,999.00
Year:1970 Mileage:120000
Location:

70 ELDORADO 500 CID ORIGINAL CONDITION RUST FREE STRAIGHT CAR, NEEDS PAINT. RUNS AND DRIVES BEEN SITTING MANY YEARS

Auto blog

Cadillac rushing update for laggy CUE infotainment system

Tue, 05 Feb 2013

BMW's innovative iDrive was introduced in 2001, and a dozen years later, automakers are still learning hard lessons about what consumers want in their infotainment systems. In response to owner feedback - and a few media drubbings - about the delayed and occasionally fickle responses of its CUE (short for Cadillac User Experience) system, Cadillac has told Wired that it's going to issue an update this year.
Coming for the XTS and ATS, the new software will mean quicker haptic feedback to driver inputs on the touchscreen and the buttons, and snappier responses on screen. Down the road, Cadillac's VP of marketing says that a different mix of screen controls and hard buttons is "something you'll be seeing in the future" - the system is presently a mix of touchscreen-based controls and capacitive-touch switchgear - there are no knobs or physical pushbuttons to speak of, and the omission of both has proven to be a divisive issue among consumers and industry pundits.
Cadillac hasn't provided a date for when the CUE update will be issued, but it has indicated that the service will be performed by dealers, not sent wirelessly.

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle

First Cadillac ELR rolls off the line

Thu, 30 May 2013

Gearing up for the Belle Isle Grand Prix this weekend, General Motors invited some of the Chevrolet and Cadillac racecar drivers out to its Detroit-Hamtramck assembly plant. While there, the racers - including IndyCar Driver and Chevrolet Volt owner, Simona De Silvestro - witnessed the very first 2014 Cadillac ELR to roll off the assembly line.
These vehicles are not destined for customers, however, but instead pre-production units will be used by engineers for testing purposes. Actual production of ELR consumer models is expected to commence closer to the end of this year. As a refresher, this range-extended electric Cadillac shares much of its powertrain with the Volt but will have a sportier coupe design inspired by the Converj Concept. De Silvestro manged to snap a few images of here own, which you can see in the gallery below.