Find or Sell Used Cars, Trucks, and SUVs in USA

1970 Cadillac Eldorado 2 Ht One Owner - Excellent Condition on 2040-cars

Year:1970 Mileage:42321 Color: Brown /
 Gold
Location:

College Place, Washington, United States

College Place, Washington, United States
Advertising:
Body Type:Coupe
Engine:8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
VIN: H0206944 Year: 1970
Model: Eldorado
Warranty: Vehicle does NOT have an existing warranty
Mileage: 42,321
Sub Model: 2 Dr Hard To
Exterior Color: Brown
Doors: 2
Interior Color: Gold
Drive Train: Rear Wheel Drive
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Washington

WheelKraft NW ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: Vancouver
Phone: (360) 546-1799

Westside Import Repair ★★★★★

Auto Repair & Service, Brake Repair
Address: 3606 SW Alaska St, Retsil
Phone: (206) 937-0200

West Coast Auto Glass Inc ★★★★★

Auto Repair & Service, Glass-Auto, Plate, Window, Etc, Windshield Repair
Address: 23125 Highway 99, Kingston
Phone: (425) 967-5707

Wayne`s Gold Seal Auto Repair ★★★★★

Auto Repair & Service, Brake Repair, Recreational Vehicles & Campers-Repair & Service
Address: 1118 W Northwest Blvd, Nine-Mile-Falls
Phone: (509) 327-5667

Tomoko Auto Care Ctr ★★★★★

Auto Repair & Service
Address: 1222 E Madison St Ste A, Sammamish
Phone: (206) 329-5212

Texaco Xpress Lube ★★★★★

Auto Repair & Service, Auto Oil & Lube, Gas Stations
Address: 826 SE Midway Blvd, Oak-Harbor
Phone: (360) 675-7011

Auto blog

Cadillac prepares to top its own 'Ring record with upcoming new CTS-V

Mon, 14 Jul 2014

It was a big deal back in 2008 when the original Cadillac CTS-V clocked a lap time of 7:59 at the Nürburgring, making it the fastest sedan ever to lap the Nordschleife to that date. Not many four-doors have bested that time since - the list consisting pretty much only of the Porsche Panamera Turbo - but now hot hatches are lapping faster than that, so you can bet that the new one will manage an even better time.
Now we've spotted the upcoming new CTS-based performance sedan several times before undergoing testing in locations around the world, but this is the first time we've seen it at the Nürburgring, apparently using the Goodyear Dunlop test facility as its base of operations (and still wearing Michigan manufacturer plates, incidentally). Considering how well the outgoing CTS-V performed and how much further you can bet Cadillac will push the envelop this time around, a new sedan lap record is almost a certainty - and we can only hope for an all-out war between Europe's performance sedan power houses to ensue.

Lansing builds its millionth Cadillac

Wed, 18 Sep 2013

Cadillacs are built at plants across North America. The Escalade is assembled in Texas, the SRX in Mexico and the XTS in Ontario. But the bulk of Cadillac's lineup - or the smaller members of the family, at least - are built in Michigan. And while the upcoming ELR will be built alongside the Chevy Volt at the Detroit/Hamtramck facility (which incidentally opened with the Cadillac Eldorado back in '86), the majority of those Cadillacs built in Michigan are handled by the Lansing Grand River Assembly Plant.
In fact, Lansing Grand River just celebrated its millionth Cadillac built. The landmark millionth vehicle is a new 2014 CTS sedan in Red Obsession Tintcoat. The facility opened in 2001 and has built Cadillacs almost exclusively since then, assembling the CTS and ATS model lines, though in a couple of years it will also handle production of the Chevy Camaro.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.