Find or Sell Used Cars, Trucks, and SUVs in USA

2010 Cadillac Dts Platinum on 2040-cars

US $1,500.00
Year:2010 Mileage:123801 Color: Black
Location:

Fort Lauderdale, Florida, United States

Fort Lauderdale, Florida, United States
Advertising:
Body Type:Sedan
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Private Seller
Vehicle Title:Clean
Engine:4.6L Gas V8
Seller Notes: “Buyer is responsible for pickup or shipping Car is being sold as is no warranty”
Year: 2010
VIN (Vehicle Identification Number): 1G6KP5E96AU116650
Mileage: 123801
Trim: PLATINUM
Number of Cylinders: 8
Make: Cadillac
Drive Type: FWD
Model: DTS
Exterior Color: Black
Condition: UsedA vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Florida

Y & F Auto Repair Specialists ★★★★★

Auto Repair & Service, Wheel Alignment-Frame & Axle Servicing-Automotive, Auto Transmission
Address: 5130 NW 15th St, Lauderdale-Lakes
Phone: (954) 978-7799

X-quisite Auto Refinishing ★★★★★

Automobile Body Repairing & Painting
Address: 1300 W Industrial Ave, Greenacres
Phone: (561) 292-3174

Wilt Engine Services ★★★★★

Auto Repair & Service, Engine Rebuilding & Exchange, Automobile Machine Shop
Address: 2202 D R Bryant Rd, Zephyrhills
Phone: (863) 858-4054

White Ford Company Inc ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: Kingsley-Lake
Phone: (352) 493-4297

Wheels R US ★★★★★

Auto Repair & Service
Address: 920 N US Highway 17 92, Winter-Park
Phone: (407) 699-9993

Volkswagen Service By Full Throttle ★★★★★

New Car Dealers, Automobile Repairing & Service-Equipment & Supplies, Brake Repair
Address: 6956 Edgewater Dr, Fern-Park
Phone: (407) 253-9081

Auto blog

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.

GM announces $7 billion Michigan factory investment, most going to EVs

Tue, Jan 25 2022

GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling.  GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra.  GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra.  The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee.  Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.

2014 Cadillac CTS Vsport [w/video]

Mon, 16 Sep 2013

Bridging The Gap With Power And Poise
As you read these words, West Coast Editor Michael Harley is preparing to drive the brand-new 2014 Cadillac CTS along the gorgeous, sun-drenched roads of Southern California. And while I'll wait for Harley's full report before I put words in his mouth, I'm willing to bet he enjoys the hell out of Cadillac's new CTS. In fact, I'm sure of it.
I say this with confidence because, about a month ago, I spent the better part of a day flogging the new CTS Vsport around the 2.9-mile Milford Road Course - a challenging circuit laid out in the infield of an oval test track at GM's proving grounds in southeast Michigan. The MRC was built about a decade ago after Bob Lutz was lured out of retirement to work closely with GM's product development team, and thus, this circuit is known informally as the "Lutz Ring." The main objective of the MRC was to have an in-house facility for engineers to fine-tune vehicle dynamics, without having to constantly schlep cars over to Germany's infamous Nürburgring. (Of course, they still do.)