Find or Sell Used Cars, Trucks, and SUVs in USA

2006 Cadillac Dts Luxury Ii 1 Owner Only 15,921 Original Miles Since New on 2040-cars

US $19,900.00
Year:2006 Mileage:15921 Color: Green /
 Tan
Location:

Newfield, New Jersey, United States

Newfield, New Jersey, United States
Advertising:
Body Type:Sedan
Transmission:Automatic
Vehicle Title:Clean
Engine:4.6L DOHC V8
For Sale By:Dealer
Year: 2006
VIN (Vehicle Identification Number): 1G6KD57Y86U197641
Mileage: 15921
Make: Cadillac
Model: DTS
Doors: 4
Exterior Color: Green
Interior Color: Tan
VIN: 1G6KD57Y86U197641 Cylinders: 8-Cyl.
Trim: Luxury II 1 Owner Only 15,921 Original Miles Since New
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in New Jersey

Zambrand Auto Repair Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Inspection Stations & Services
Address: 250 42nd St, Bloomfield
Phone: (718) 965-1903

W J Auto Top & Interiors ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Seat Covers, Tops & Upholstery
Address: 2255 Wyandotte Rd Ste B, Pennsauken
Phone: (215) 659-5125

Vreeland Auto Body Co Inc ★★★★★

Automobile Body Repairing & Painting, Used Car Dealers, Automobile Repairing & Service-Equipment & Supplies
Address: 330 Vreeland Ave, Haskell
Phone: (973) 684-1382

Used Tire Center ★★★★★

Automobile Parts & Supplies, Tire Dealers
Address: 1070 Salem Rd, North-Plainfield
Phone: (908) 349-8027

Swartswood Service Station ★★★★★

Auto Repair & Service, Gas Stations
Address: 902 Swartswood Rd, Tranquility
Phone: (973) 383-4345

Sunrise Motors ★★★★★

New Car Dealers, Automobile & Truck Brokers
Address: 430 Industrial Ave Ste 11P, Ridgefield
Phone: (201) 462-9000

Auto blog

GM's latest production delays: Colorado/Canyon, Cadillac CT4/CT5, Camaro

Wed, Mar 24 2021

DETROIT — General Motors Co extended production cuts in North America on Wednesday due to a worldwide semiconductor chip shortage that has impacted the auto sector. The U.S. automaker said its Wentzville, Missouri, assembly plant would be idled during the weeks beginning March 29 and April 5. It will extend down time at its plant in Lansing, Michigan, which has been idled since March 15, by two weeks. The action was factored into GM's prior forecast that it could shave up to $2 billion off this year's profit, spokesman David Barnas said. GM did not disclose how much volume would be lost by the move, but said it intended to make up as much lost production as possible later in the year. The chip shortage came as North American auto plants were shut for two months during the COVID-19 pandemic last year and chip orders were canceled, and as demand surged from the consumer electronics industry as people worked from home and played video games. That's now left carmakers competing for chips. Semiconductors are used extensively in cars, including to monitor engine performance, manage functions for everything from steering to automatic windows, and in sensors used in parking and entertainment systems. Vehicles affected by the GM production cuts include the mid-sized pickup trucks, the Chevrolet Colorado and GMC Canyon in Missouri, and the Cadillac CT4 and CT5 and Chevy Camaro cars in Michigan. Meanwhile, GM said its San Luis Potosi, Mexico, assembly plant, idled since Feb. 8, will resume production with two shifts beginning the week of April 5. Last week, GM said it was building certain 2021 light-duty full-size pickups without a fuel management module, hurting their fuel economy performance by one mile per gallon. Exacerbating the shortage is a recent fire at a Renesas Electronics chip plant in Japan. Barnas said GM was assessing the impact of the fire.  

GM and LG Energy Solution will build their second battery plant in Tennessee

Sat, Apr 17 2021

DETROIT — General Motors and South Korean joint-venture partner LG Energy Solution on Friday said they will build a second U.S. battery cell manufacturing plant, revealing plans for a $2.3 billion factory in Spring Hill, Tennessee. The planned 2.8 million-square-foot plant, scheduled to open in late 2023, will employ 1,300 people and will have production capacity of about 35 gigawatt-hours, similar to the companies' Ultium Cells joint-venture plant in Lordstown, Ohio, as they move to respond to the growing demand in the electric vehicle market. The plant's capacity would enable it to supply battery packs for more than 500,000 electric vehicles a year. "The addition of our second all-new Ultium battery cell plant in the U.S. with our joint venture partner LG Energy Solution is another major step in our transition to an all-electric future," GM Chief Executive Mary Barra said. The United Auto Workers on Friday called on GM to ensure the new plant is staffed with union-represented workers, which GM officials have said would be determined by the employees. LG Chem said in a regulatory filing that its LG Energy Solution unit will invest $933.5 million in the plant between this year and 2023. GM and LG Energy Solution will use a different, less-expensive battery chemistry in Tennessee than the one to be used in the Lordstown plant that opens next year, sources previously told Reuters. Sources have said the No. 1 U.S. automaker will need more battery plants beyond Tennessee to meet aggressive EV targets, including projected sales of more than 1 million EVs globally in 2025. GM's longer-range target includes halting sales of light-duty gasoline and diesel-powered vehicles by 2035. Most battery manufacturing is currently concentrated in China and Korea, while Tesla and Japanese partner Panasonic largely control most U.S. battery production. When it opens, the new GM-LG battery plant will supply batteries for the Cadillac Lyriq crossover EV that GM is slated to start building at its nearby Spring Hill assembly plant next year. LG is expected to supply the batteries from Korea until then. Supplier sources said a second Cadillac electric crossover, called Symboliq, is expected to join the Lyriq in production at Spring Hill in 2024, along with two new electric crossovers for Honda and its premium Acura brand. GM said in October it would invest $2 billion in Spring Hill to build EVs.

Cadillac upgrades ATS sedan to match new coupe

Thu, 10 Jul 2014

The big news when it comes to the Cadillac ATS for 2015 is surely the addition of the new coupe model, but that doesn't mean that Cadillac has forgotten about the sedan as well. In fact GM's luxury brand has rolled out a few choice enhancements for the four-door to bring it more in line with the new coupe.
Among those changes that we spotted a couple of weeks ago is a new front fascia that incorporates the brand's new wreath-less emblem, and a sleeker front bumper. The interior has been upgraded as well with new trim options as well as some new tech including Siri Eyes Free functionality, dictated text messaging and optional inductive smartphone charging.
Though the ATS Coupe does away with the base engine, sedan buyers can still opt for the 2.0-liter four with 202 horsepower and 191 pound-feet of torque. The 3.6-liter V6 carries over unchanged at 321 hp and 275 lb-ft, but the 2.0-liter turbo four gets the upgraded torque rating of 295 lb-ft (the highest in the range) to go with its 272 hp. Some new color choices are also among the upgrades you can read more about in the press release below.