1967 Buick Special, 46000 Original Miles on 2040-cars
Aumsville, Oregon, United States
Engine:300 cubic inch
Body Type:Coupe
Vehicle Title:Clear
For Sale By:Private Seller
Exterior Color: Blue
Make: Buick
Interior Color: Blue
Model: Skylark
Number of Cylinders: 8
Trim: special
Drive Type: rwd
Mileage: 46,000
Buick Skylark for Sale
- 445 wildcat, show-stopper midnight blue, fresh resto, ps, pb, owners manual(US $27,995.00)
- 1969 buick skylark gs(US $55,000.00)
- Super sleeper(US $22,900.00)
- 1969 buick skylark gs california(US $1,500.00)
- (US $25,000.00)
- (US $17,500.00)
Auto Services in Oregon
Tom`s Import Service ★★★★★
Thunder Auto Detailing ★★★★★
The Brake Shop ★★★★★
Texaco Xpress Lube ★★★★★
Speed`s Towing ★★★★★
Specialty Auto Electric ★★★★★
Auto blog
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly
GM recalling 1.5M cars in China for faulty bracket
Fri, 27 Dec 2013General Motors and its Chinese partners have announced their second recall in the People's Republic this year, following a 2,653-unit recall of the Cadillac SRX earlier this year. This latest recall affects nearly 1.5 million cars built between 2006 and 2012. It's not explicitly stated, but as there's no movement from the US NHTSA, we suspect that the cars in question were all Chinese-built rather than imports.
The vast majority of the affected vehicles are Buick Excelles (pictured), with 1.2 million units being recalled over a faulty bracket that's meant to secure the fuel pump. The Excelles in question were built between 2006 and 2012, while an additional 250,000 Chevrolet Sail superminis, built between April 2009 and October 2011, are being recalled for a similar reason.
According to the PRC's Administration for Quality Supervision, Inspection and Quarantine, the faulty bracket could crack and potentially cause a fuel leak.
Opel to electrify all model lines by 2024, speeding PSA transition
Thu, Nov 9 2017What do you see in the Opel logo? That's right, a lightning bolt. As the German automaker dramatically restructures its future plans, electric cars are in the core of Opel's survival. With attempts to stop leaking money, Opel is speeding up its secession from GM technology, launching nine new models by 2020 with the aim to complete transition to PSA hardware by 2024, leaving only two Opel platforms. This is all part of Opel's freshly announced PACE turnaround plan, which is crucial for the company's survival, according to CEO Michael Lohscheller. "PACE will unleash our full potential. This plan is paramount for the company, to protect our employees against headwinds and turn Opel/Vauxhall into a sustainable, profitable, electrified, and global company," says Lohscheller. Competitiveness will be improved by reducing per-car costs by 700 euros, and by cutting marketing costs by 10 percent. Regarding Vauxhall's future, the statement still includes the British brand. When the Opel sale agreement was reached between PSA and GM in March, the plan was to start implementing PSA technology in 2019, completing the transition in eight years, as Automotive News says. The new business plan is noticeably faster. By 2020, with full access to PSA's electric tech, Opel would have a fully electric next-generation Corsa hatchback and a PHEV version of the Grandland X SUV, which is already based on Peugeot's 3008 model. Currently, there are nine Opel platforms and 10 engine families. By 2024 there should be two platforms and four powertrains; the number of diesel engines in use remains to be seen, and all product lines would include an electrified model. There would be an SUV and a midsize vehicle based on PSA's EMP2 architecture, with the former built in Eisenach — formerly known as the town that built East German Wartburg cars before its Opel era — and the latter built in Russelsheim, where Opel HQ is located. The Russelsheim hub will become PSA's global "competence center," where all Opel/Vauxhall vehicles would be engineered — not Paris. Plans include avoiding any factory closures or personnel layoffs. The PACE statement also mentions Opel's entrance to all of 20 new export markets, with a specific mention of China and Brazil, countries which have traditionally seen Opels sold as Chevrolets. Will the United States be included in that export plan?